Matches in DBpedia 2014 for { ?s ?p Earthfill south dam in foreground with view along main dam. The wall beyond is to separate spillway and turbine flows from the lock and ship lift upstream approach channel. A similar separation is used on the downstream side, seen partially in the preceding image.. }
Showing items 1 to 1 of
1
with 100 items per page.