Data Portal @ linkeddatafragments.org

DBpedia 2014

Search DBpedia 2014 by triple pattern

Matches in DBpedia 2014 for { ?s ?p Gevingåsen Tunnel is a 4.4-kilometer (2.7 mi) single track railway tunnel between Hommelvik and Hell, Norway, on the Nordland Line. Blasting started in 2009, and the tunnel opened on 15 August 2011, having cost 635 million Norwegian krone (NOK). Built by the Norwegian National Rail Administration, the tunnel has shortened travel time south of Stjørdal by five minutes and increased the capacity of the Trondheim–Stjørdal to four trains per hour in each direction. The tunnel was the first stage in a project to reduce travel time between Steinkjer and Trondheim to one hour. The tunnel section will not be suitable for high-speed trains, as it was built with curves with too small a diameter, notwithstanding political debate about both these tight curves and the possibility of double track. The whole project involved 5.7 kilometres (3.5 mi) of new tracks and permanent way. The blasted rock is used to build a new apron at Trondheim Airport, Værnes.. }

Showing items 1 to 1 of 1 with 100 items per page.