Matches in DBpedia 2014 for { ?s ?p Lake Bonney Wind Farm, in South Australia, was built in two stages. Stage 1 consisted of 46 turbines each having a rated capacity of 1.75 MW (total 80.5 MW) and was finished in March 2005. Construction of Stage 2 began in November 2006 and was finished around April 2008. Stage 2 consisted of 53 turbines of 3 MW (total 159 MW).. }
Showing items 1 to 1 of
1
with 100 items per page.
- Lake_Bonney_Wind_Farm comment "Lake Bonney Wind Farm, in South Australia, was built in two stages. Stage 1 consisted of 46 turbines each having a rated capacity of 1.75 MW (total 80.5 MW) and was finished in March 2005. Construction of Stage 2 began in November 2006 and was finished around April 2008. Stage 2 consisted of 53 turbines of 3 MW (total 159 MW).".