Matches in DBpedia 2014 for { ?s ?p Line 6 Shenzhen Metro is currently under construction. Line 6 has a length of 37.85 km and a total of 20 stations. It connects the Songgang to Shenzhen North Railway Station. It Line 6 started construction in 2012, with the first segment scheduled to be opened traffic in 2017.. }
Showing items 1 to 2 of
2
with 100 items per page.
- Line_6,_Shenzhen_Metro abstract "Line 6 Shenzhen Metro is currently under construction. Line 6 has a length of 37.85 km and a total of 20 stations. It connects the Songgang to Shenzhen North Railway Station. It Line 6 started construction in 2012, with the first segment scheduled to be opened traffic in 2017.".
- Line_6,_Shenzhen_Metro comment "Line 6 Shenzhen Metro is currently under construction. Line 6 has a length of 37.85 km and a total of 20 stations. It connects the Songgang to Shenzhen North Railway Station. It Line 6 started construction in 2012, with the first segment scheduled to be opened traffic in 2017.".