Matches in DBpedia 2014 for { ?s ?p Ngong Power Station wind farm began with two wind turbines commissioned in 1993 as a donation from the Belgian Government. However the two turbines were retired. The second phase of the Ngong wind farm was commissioned in August 2009 and has a capacity of 5.1 MW of power. The grid-connected facility is on the northern part of the Ngong Hills, near, Nairobi, the capital and largest city in Kenya.. }
Showing items 1 to 2 of
2
with 100 items per page.
- Ngong_Hills_Wind_Farm abstract "Ngong Power Station wind farm began with two wind turbines commissioned in 1993 as a donation from the Belgian Government. However the two turbines were retired. The second phase of the Ngong wind farm was commissioned in August 2009 and has a capacity of 5.1 MW of power. The grid-connected facility is on the northern part of the Ngong Hills, near, Nairobi, the capital and largest city in Kenya.".
- Ngong_Hills_Wind_Farm comment "Ngong Power Station wind farm began with two wind turbines commissioned in 1993 as a donation from the Belgian Government. However the two turbines were retired. The second phase of the Ngong wind farm was commissioned in August 2009 and has a capacity of 5.1 MW of power. The grid-connected facility is on the northern part of the Ngong Hills, near, Nairobi, the capital and largest city in Kenya.".