Data Portal @ linkeddatafragments.org

DBpedia 2014

Search DBpedia 2014 by triple pattern

Matches in DBpedia 2014 for { ?s ?p The January 25, 2012 Vieira Fazenda office block collapse involved the progressive collapse of 3 commercial office buildings, split by R. Vieira Fazenda street in the municipality of Praça Floriano, Rio de Janeiro, Brazil.The three buildings involved were (from west to east): Building 1 (a 22-story building located at Av. Alm. Barroso, 6 - Centro, Rio de Janeiro, 20031-000, Brazil), Building 2 (a 23-story building located at Av. Alm. Barroso, 22 - Centro, Rio de Janeiro, 20031-000, Brazil) and Building 3 (a 6-story building located at Av. Rio Branco, 180 - Centro, Rio de Janeiro, 20040-003, Brazil).At 8:33 PM, the 23-story Building 2, began collapsing in the eastward direction towards the 6-story Building 3, which was located on the opposite side of R. Vieira Fazenda street. Building 2 was structurally connected to the adjoining 22-story Building 1, which caused it to pull Building 1 laterally eastward during its collapse. This extreme lateral shift caused the failure of enough support columns to result in the collapse of Building 1. As Building 2 continued its collapse in the eastward direction, its debris crashed through the roof and western load bearing wall of the 6-story Building 3, causing it to collapse as well.A total of 17 people were killed in the disaster. The initial collapse of the 23-story Building 2, was due to structural failure, which was caused by illegal construction work taking place inside the building on the 9th and 10th floors.. }

Showing items 1 to 1 of 1 with 100 items per page.