Data Portal @ linkeddatafragments.org

DBpedia 2014

Search DBpedia 2014 by triple pattern

Matches in DBpedia 2014 for { ?s ?p The South Atlantic Cable System (SACS), also known as the Angola-Brazil Cable, is a planned submarine communications cable in the South Atlantic Ocean linking Luanda, Angola with Fortaleza, Brazil with a leg connecting the Brazilian archipelago of Fernando de Noronha as well. It is designed to provide low latency routing between Africa and Asia in the east and the Americas in the west. Data traffic between Angola and Brazil will no longer have to pass through Europe and the US, as currently occurs.It is expected that the SACS will cut data traffic costs between South America, Africa and onwards to Asia by 80%. In Fortaleza the SACS will be interconnected to Seabras-1 while the Angolan end will provide onward connectivity by the SAT-3/WASC cable.According to its initiators it will have a lot of demand, mainly because it will be the first undersea cable in the South Atlantic linking the African continent to Latin America. Two other planned cables, namely the South Atlantic Express cable and the WASACE South cable, will potentially compete with the SACS on the South Atlantic route.The cable will measure 6,165 km in length and will contain four fibre pairs, each capable of transmitting 100 wavelengths with a bandwidth of 100Gbit/s each. Construction costs are expected to amount to $ 278 million, funded by Angola Cables, a consortium of major Angolan telecoms companies (Angola Telecom with 51% of the capital, Unitel with 31%, MSTelcom with 9%, Movicel with 6%, and Startel with 3%). Although Brazilian Telebras announced in December 2011 that they would jointly launch the undersea cable with Angola Cables, in media reports from February 2014 Telebras made clear that they had only made "the offer of a landing point on Brazilian soil" and would not participate in the joint venture.In January 2014 it was announced that construction of the cable would start already in the first quarter 2014 and would be completed within 18 months, earlier than originally anticipated.. }

Showing items 1 to 1 of 1 with 100 items per page.