Matches in DBpedia 2014 for { ?s ?p The THTR-300 was a thorium high-temperature nuclear reactor rated at 300 MW electric (THTR-300). The German state of North Rhine Westphalia, in the Federal Republic of Germany, and Hochtemperatur-Kernkraftwerk GmbH (HKG) financed the THTR-300’s construction.Operations started on the plant in Hamm-Uentrop, Germany in 1983, and it was shut down September 1, 1989. The THTR was synchronized to the grid for the first time in 1985 and started full power operation in February 1987.Whereas the AVR was an experimental pebble bed high-temperature reactor (HTR) used to develop the pebble fuel, the THTR-300 served as a prototype HTR to use the TRISO pebble fuel. The THTR-300 cost €2.05 billion and was predicted to cost an additional €425 million through December 2009 in decommissioning and other associated costs.. }