Data Portal @ linkeddatafragments.org

DBpedia 2014

Search DBpedia 2014 by triple pattern

Matches in DBpedia 2014 for { ?s ?p The Turgi–Koblenz–Waldshut railway line was opened on 18 August 1859 by the Swiss Northeastern Railway (German: Schweizerische Nordostbahn, NOB). It runs from Turgi in Switzerland via Koblenz to Waldshut in Germany. The Turgi–Koblenz–Waldshut line was the first rail link between Germany and Switzerland. It provides a connection from the Baden–Brugg line in Turgi to the Upper Rhine Railway in Waldshut.Two branch lines were later built to Koblenz station: on 1 August 1876 the Winterthur–Bülach–Koblenz railway line opened via Eglisau and Bülach to Winterthur, and on 1 August 1892 the line opened to Stein-Säckingen, connecting to Basel.. }

Showing items 1 to 1 of 1 with 100 items per page.