Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Line_8,_Suzhou_Rail_Transit> ?p ?o. }
Showing items 1 to 37 of
37
with 100 items per page.
- Line_8,_Suzhou_Rail_Transit abstract "Line 8 is a planned lateral line of Line 4, Suzhou Rail Transit. Construction is expected to start in 2012, and the line will be 11.1 kilometers long. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line. According to those plans the old part of Line 4 between Shihulu (石湖路) station and Wangshanlu (旺山路) station will be operated as Line 8.".
- Line_8,_Suzhou_Rail_Transit isPartOf Suzhou_Rail_Transit.
- Line_8,_Suzhou_Rail_Transit lineLength "11100.0".
- Line_8,_Suzhou_Rail_Transit numberOfStations "7".
- Line_8,_Suzhou_Rail_Transit status "Under construction".
- Line_8,_Suzhou_Rail_Transit thumbnail SRT-8.png?width=300.
- Line_8,_Suzhou_Rail_Transit type Rapid_transit.
- Line_8,_Suzhou_Rail_Transit wikiPageID "36183343".
- Line_8,_Suzhou_Rail_Transit wikiPageRevisionID "603455590".
- Line_8,_Suzhou_Rail_Transit hasPhotoCollection Line_8,_Suzhou_Rail_Transit.
- Line_8,_Suzhou_Rail_Transit imageWidth "265".
- Line_8,_Suzhou_Rail_Transit linelength "11.1".
- Line_8,_Suzhou_Rail_Transit mapState "collapsed".
- Line_8,_Suzhou_Rail_Transit operator "Suzhou Rail Transit Co., Ltd".
- Line_8,_Suzhou_Rail_Transit owner "Suzhou Rail Transit Co., Ltd".
- Line_8,_Suzhou_Rail_Transit stations "7".
- Line_8,_Suzhou_Rail_Transit status "Under construction".
- Line_8,_Suzhou_Rail_Transit system Suzhou_Rail_Transit.
- Line_8,_Suzhou_Rail_Transit type Rapid_transit.
- Line_8,_Suzhou_Rail_Transit subject Category:Suzhou_Rail_Transit.
- Line_8,_Suzhou_Rail_Transit type ArchitecturalStructure.
- Line_8,_Suzhou_Rail_Transit type Infrastructure.
- Line_8,_Suzhou_Rail_Transit type Place.
- Line_8,_Suzhou_Rail_Transit type RailwayLine.
- Line_8,_Suzhou_Rail_Transit type RouteOfTransportation.
- Line_8,_Suzhou_Rail_Transit type Wikidata:Q532.
- Line_8,_Suzhou_Rail_Transit type Place.
- Line_8,_Suzhou_Rail_Transit type Location.
- Line_8,_Suzhou_Rail_Transit comment "Line 8 is a planned lateral line of Line 4, Suzhou Rail Transit. Construction is expected to start in 2012, and the line will be 11.1 kilometers long. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line. According to those plans the old part of Line 4 between Shihulu (石湖路) station and Wangshanlu (旺山路) station will be operated as Line 8.".
- Line_8,_Suzhou_Rail_Transit label "Line 8, Suzhou Rail Transit".
- Line_8,_Suzhou_Rail_Transit label "苏州轨道交通8号线".
- Line_8,_Suzhou_Rail_Transit sameAs m.0k0vc7n.
- Line_8,_Suzhou_Rail_Transit sameAs Q6553157.
- Line_8,_Suzhou_Rail_Transit sameAs Q6553157.
- Line_8,_Suzhou_Rail_Transit wasDerivedFrom Line_8,_Suzhou_Rail_Transit?oldid=603455590.
- Line_8,_Suzhou_Rail_Transit depiction SRT-8.png.
- Line_8,_Suzhou_Rail_Transit isPrimaryTopicOf Line_8,_Suzhou_Rail_Transit.