Matches in DBpedia 2014 for { ?s ?p United Gas Pipe Line Co. v. Mobile Gas Service Corp., 350 U.S. 332 (1956), is a United States Supreme Court case in which the Court interpreted the Natural Gas Act of 1938 (NGA) as not allowing a gas supply company to unilaterally modify rates in a natural gas supply contract by filing a new rate schedule with the Federal Power Commission (FPC). Mobile Gas and its companion case Federal Power Commission v. Sierra Pacific Power Co. established the Mobile-Sierra presumption which holds that an electricity or natural gas supply rate established resulting from a freely negotiated contract is presumed to be "just and reasonable" and thus acceptable under the NGA or Federal Power Act (FPA).. }
Showing items 1 to 1 of
1
with 100 items per page.
- United_Gas_Pipe_Line_Co._v._Mobile_Gas_Service_Corp. abstract "United Gas Pipe Line Co. v. Mobile Gas Service Corp., 350 U.S. 332 (1956), is a United States Supreme Court case in which the Court interpreted the Natural Gas Act of 1938 (NGA) as not allowing a gas supply company to unilaterally modify rates in a natural gas supply contract by filing a new rate schedule with the Federal Power Commission (FPC). Mobile Gas and its companion case Federal Power Commission v. Sierra Pacific Power Co. established the Mobile-Sierra presumption which holds that an electricity or natural gas supply rate established resulting from a freely negotiated contract is presumed to be "just and reasonable" and thus acceptable under the NGA or Federal Power Act (FPA).".