Data Portal @ linkeddatafragments.org

DBpedia 2014

Search DBpedia 2014 by triple pattern

Matches in DBpedia 2014 for { ?s ?p The Cherry Street streetcar line is being built by Waterfront Toronto, in cooperation with the Toronto Transit Commission.In 2012 construction began on the northern section of Cherry Street, from King Street to Lake Shore Boulevard. This section is projected to cost $90 million CAD.In 2007, when the plan was being finalized, this route was to be the only route with a separate right of way beside a roadway.A tree-lined median will separate the streetcar right of way from Cherry Street.. }

Showing items 1 to 1 of 1 with 100 items per page.