Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Cherry_Street_streetcar_line> ?p ?o. }
Showing items 1 to 50 of
50
with 100 items per page.
- Cherry_Street_streetcar_line abstract "The Cherry Street streetcar line is being built by Waterfront Toronto, in cooperation with the Toronto Transit Commission.In 2012 construction began on the northern section of Cherry Street, from King Street to Lake Shore Boulevard. This section is projected to cost $90 million CAD.In 2007, when the plan was being finalized, this route was to be the only route with a separate right of way beside a roadway.A tree-lined median will separate the streetcar right of way from Cherry Street. Cherry Street will be reduced to just one lane in each direction.The sidewalks will be widened to 5 metres.The initial segment of the line, from King Street to Lake Shore Boulevard, is approximately 700 metres long, and will have just three stops on it.A streetcar loop is being built on Cherry Street across from Distillery Lane.Original plans called for the line to extend further south into redeveloped Port Lands.That extension would have pushed the budget for the line to $300 million CAD.The Toronto Transportation Commission operated, the former Toronto Railway Company, Ashbridge streetcar into that area in the 1920s.It connected to the streetcar grid at Queen Street, just west of Broadview Avenue and ran south to Commissioners Street then west to Cherry Street.".
- Cherry_Street_streetcar_line lineLength "700.0".
- Cherry_Street_streetcar_line location Ontario.
- Cherry_Street_streetcar_line location Toronto.
- Cherry_Street_streetcar_line operatedBy Toronto_Transit_Commission.
- Cherry_Street_streetcar_line routeEnd Lake_Shore_Boulevard.
- Cherry_Street_streetcar_line routeStart King_Street_(Toronto).
- Cherry_Street_streetcar_line status "under construction".
- Cherry_Street_streetcar_line thumbnail Cherry_Street_fresh_tracks_s.JPG?width=300.
- Cherry_Street_streetcar_line wikiPageID "36486054".
- Cherry_Street_streetcar_line wikiPageRevisionID "601602088".
- Cherry_Street_streetcar_line align "left".
- Cherry_Street_streetcar_line caption "Freshly laid tracks south of Cherry Street Hotel".
- Cherry_Street_streetcar_line caption "Nearly completed track work on March 2014.".
- Cherry_Street_streetcar_line caption "Sections of rail, prepared for the line, lie on Cherry St. south of Commissioners St.".
- Cherry_Street_streetcar_line caption "Streetcar line is to be constructed in this strip east of the roadway, which is already paved".
- Cherry_Street_streetcar_line direction "horizontal".
- Cherry_Street_streetcar_line end Lake_Shore_Boulevard.
- Cherry_Street_streetcar_line gauge "- TTC Gauge".
- Cherry_Street_streetcar_line hasPhotoCollection Cherry_Street_streetcar_line.
- Cherry_Street_streetcar_line image "Cherry Street line ROW to be here.JPG".
- Cherry_Street_streetcar_line image "Cherry Street line distant rails.JPG".
- Cherry_Street_streetcar_line image "Construction of the route of the Cherry Street streetcar, Toronto, 2014 03 25 .jpg".
- Cherry_Street_streetcar_line imageWidth "280".
- Cherry_Street_streetcar_line locale Ontario.
- Cherry_Street_streetcar_line locale Toronto.
- Cherry_Street_streetcar_line name "Cherry Street".
- Cherry_Street_streetcar_line operator Toronto_Transit_Commission.
- Cherry_Street_streetcar_line routes "504".
- Cherry_Street_streetcar_line start King_Street_(Toronto).
- Cherry_Street_streetcar_line status "under construction".
- Cherry_Street_streetcar_line width "240".
- Cherry_Street_streetcar_line subject Category:Toronto_streetcar_system.
- Cherry_Street_streetcar_line type ArchitecturalStructure.
- Cherry_Street_streetcar_line type Infrastructure.
- Cherry_Street_streetcar_line type Place.
- Cherry_Street_streetcar_line type RailwayLine.
- Cherry_Street_streetcar_line type RouteOfTransportation.
- Cherry_Street_streetcar_line type Wikidata:Q532.
- Cherry_Street_streetcar_line type Place.
- Cherry_Street_streetcar_line type Location.
- Cherry_Street_streetcar_line comment "The Cherry Street streetcar line is being built by Waterfront Toronto, in cooperation with the Toronto Transit Commission.In 2012 construction began on the northern section of Cherry Street, from King Street to Lake Shore Boulevard. This section is projected to cost $90 million CAD.In 2007, when the plan was being finalized, this route was to be the only route with a separate right of way beside a roadway.A tree-lined median will separate the streetcar right of way from Cherry Street.".
- Cherry_Street_streetcar_line label "Cherry Street streetcar line".
- Cherry_Street_streetcar_line sameAs m.0kbj2pr.
- Cherry_Street_streetcar_line sameAs Q5092484.
- Cherry_Street_streetcar_line sameAs Q5092484.
- Cherry_Street_streetcar_line wasDerivedFrom Cherry_Street_streetcar_line?oldid=601602088.
- Cherry_Street_streetcar_line depiction Cherry_Street_fresh_tracks_s.JPG.
- Cherry_Street_streetcar_line isPrimaryTopicOf Cherry_Street_streetcar_line.
- Cherry_Street_streetcar_line name "Cherry Street".