Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Advanced_planning_and_scheduling> ?p ?o. }
Showing items 1 to 41 of
41
with 100 items per page.
- Advanced_planning_and_scheduling abstract "Advanced planning and scheduling (also referred to as APS and advanced manufacturing) refers to a manufacturing management process by which raw materials and production capacity are optimally allocated to meet demand. APS is especially well-suited to environments where simpler planning methods cannot adequately address complex trade-offs between competing priorities. Production scheduling is intrinsically very difficult due to the (approximately) factorial dependence of the size of the solution space on the number of items/products to be manufactured.Traditional planning and scheduling systems (such as Manufacturing resource planning) utilize a stepwise procedure to allocate material and production capacity. This approach is simple but cumbersome, and does not readily adapt to changes in demand, resource capacity or material availability. Materials and capacity are planned separately, and many systems do not consider limited material availability or capacity constraints. Thus, this approach often results in plans that cannot be executed. However, despite attempts to shift to the new system, attempts have not always been successful, which has called for the combination of management philosophy with manufacturing.Unlike previous systems, APS simultaneously plans and schedules production based on available materials, labor and plant capacity.APS has commonly been applied where one or more of the following conditions are present:Make-To-Order (as distinct from make-to-stock) manufacturingcapital-intensive production processes, where plant capacity is constrainedproducts 'competing' for plant capacity: where many different products are produced in each facilityproducts that require a large number of components or manufacturing tasksproduction necessitates frequent schedule changes which cannot be predicted before the eventAdvanced Planning & Scheduling software enables manufacturing scheduling and advanced scheduling optimization within these environments.".
- Advanced_planning_and_scheduling wikiPageExternalLink frepple.com.
- Advanced_planning_and_scheduling wikiPageExternalLink planettogether.com.
- Advanced_planning_and_scheduling wikiPageExternalLink www.aimms.com.
- Advanced_planning_and_scheduling wikiPageExternalLink www.asprova.com.
- Advanced_planning_and_scheduling wikiPageExternalLink cyberplan.html.
- Advanced_planning_and_scheduling wikiPageExternalLink planner_eng.
- Advanced_planning_and_scheduling wikiPageExternalLink www.etalika.in.
- Advanced_planning_and_scheduling wikiPageExternalLink www.ompartners.com.
- Advanced_planning_and_scheduling wikiPageExternalLink www.quintiq.com.
- Advanced_planning_and_scheduling wikiPageExternalLink aps-advanced-planning-and-scheduling.
- Advanced_planning_and_scheduling wikiPageExternalLink www.simulation.co.uk.
- Advanced_planning_and_scheduling wikiPageExternalLink advanced-planning-and-scheduling-software.
- Advanced_planning_and_scheduling wikiPageExternalLink www.taylor.com.
- Advanced_planning_and_scheduling wikiPageExternalLink zionex.com.
- Advanced_planning_and_scheduling wikiPageID "3551042".
- Advanced_planning_and_scheduling wikiPageRevisionID "604168972".
- Advanced_planning_and_scheduling hasPhotoCollection Advanced_planning_and_scheduling.
- Advanced_planning_and_scheduling subject Category:Information_technology_management.
- Advanced_planning_and_scheduling subject Category:Manufacturing.
- Advanced_planning_and_scheduling subject Category:Production_and_manufacturing_software.
- Advanced_planning_and_scheduling subject Category:Production_and_organizations.
- Advanced_planning_and_scheduling comment "Advanced planning and scheduling (also referred to as APS and advanced manufacturing) refers to a manufacturing management process by which raw materials and production capacity are optimally allocated to meet demand. APS is especially well-suited to environments where simpler planning methods cannot adequately address complex trade-offs between competing priorities.".
- Advanced_planning_and_scheduling label "Advanced Planning & Scheduling".
- Advanced_planning_and_scheduling label "Advanced Planning System".
- Advanced_planning_and_scheduling label "Advanced Planning and Scheduling".
- Advanced_planning_and_scheduling label "Advanced Planning and Scheduling".
- Advanced_planning_and_scheduling label "Advanced planning and scheduling".
- Advanced_planning_and_scheduling label "Advanced planning and scheduling".
- Advanced_planning_and_scheduling label "Sistemas APS".
- Advanced_planning_and_scheduling label "先進規劃排程系統".
- Advanced_planning_and_scheduling sameAs Advanced_Planning_and_Scheduling.
- Advanced_planning_and_scheduling sameAs Sistemas_APS.
- Advanced_planning_and_scheduling sameAs Advanced_Planning_and_Scheduling.
- Advanced_planning_and_scheduling sameAs Advanced_Planning_System.
- Advanced_planning_and_scheduling sameAs Advanced_planning_and_scheduling.
- Advanced_planning_and_scheduling sameAs m.09k__3.
- Advanced_planning_and_scheduling sameAs Q379686.
- Advanced_planning_and_scheduling sameAs Q379686.
- Advanced_planning_and_scheduling wasDerivedFrom Advanced_planning_and_scheduling?oldid=604168972.
- Advanced_planning_and_scheduling isPrimaryTopicOf Advanced_planning_and_scheduling.