Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Anthony_Power_Development> ?p ?o. }
Showing items 1 to 28 of
28
with 100 items per page.
- Anthony_Power_Development abstract "Anthony Power Development - was a scheme for damming small parts of the upper catchment of the Pieman River in Western Tasmania by the Hydro Tasmania as the last dam making scheme (Power Development) before the end of large scale construction of dams for hydro electricity in Tasmania.It was developed in two parts - The first development consisted of three dams: Henty Dam, White Spur Dam and Newton Dam.The second development utilised the 300 metre fall of the Anthony River to the Lake Murchison. It was completed in March 1994 and created a small lake, Lake Plimsoll.".
- Anthony_Power_Development wikiPageExternalLink Pieman+Catchment.
- Anthony_Power_Development wikiPageID "17470237".
- Anthony_Power_Development wikiPageRevisionID "579693423".
- Anthony_Power_Development hasPhotoCollection Anthony_Power_Development.
- Anthony_Power_Development subject Category:Rivers_of_Tasmania.
- Anthony_Power_Development subject Category:West_Coast_Range_(Tasmania).
- Anthony_Power_Development subject Category:Western_Tasmania.
- Anthony_Power_Development point "-41.88333333333333 145.6".
- Anthony_Power_Development type BodyOfWater109225146.
- Anthony_Power_Development type PhysicalEntity100001930.
- Anthony_Power_Development type River109411430.
- Anthony_Power_Development type RiversOfTasmania.
- Anthony_Power_Development type Stream109448361.
- Anthony_Power_Development type Thing100002452.
- Anthony_Power_Development type YagoGeoEntity.
- Anthony_Power_Development type YagoPermanentlyLocatedEntity.
- Anthony_Power_Development type SpatialThing.
- Anthony_Power_Development comment "Anthony Power Development - was a scheme for damming small parts of the upper catchment of the Pieman River in Western Tasmania by the Hydro Tasmania as the last dam making scheme (Power Development) before the end of large scale construction of dams for hydro electricity in Tasmania.It was developed in two parts - The first development consisted of three dams: Henty Dam, White Spur Dam and Newton Dam.The second development utilised the 300 metre fall of the Anthony River to the Lake Murchison.".
- Anthony_Power_Development label "Anthony Power Development".
- Anthony_Power_Development sameAs m.047c8zr.
- Anthony_Power_Development sameAs Q4773297.
- Anthony_Power_Development sameAs Q4773297.
- Anthony_Power_Development sameAs Anthony_Power_Development.
- Anthony_Power_Development lat "-41.88333333333333".
- Anthony_Power_Development long "145.6".
- Anthony_Power_Development wasDerivedFrom Anthony_Power_Development?oldid=579693423.
- Anthony_Power_Development isPrimaryTopicOf Anthony_Power_Development.