Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Berlin_North–South_mainline> ?p ?o. }
Showing items 1 to 29 of
29
with 100 items per page.
- Berlin_North–South_mainline abstract "The Berlin North-South main line (German: Nord-Süd-Fernbahn), also called the North-South link (Nord-Süd-Verbindung) called, is a railway line in Berlin, which was opened in 2006. It is an electrified line that is an important component of the “mushroom concept” (Pilzkonzept) adopted for long-distance and regional rail services through the city. Its core is an approximately 3.5 km long tunnel under the Tiergarten in Berlin. The tunnel section includes the underground level of the Berlin central station and the Potsdamer Platz regional station. The above-ground section of the line includes the Berlin Südkreuz station.".
- Berlin_North–South_mainline thumbnail Nordsuedfernbahn.jpg?width=300.
- Berlin_North–South_mainline wikiPageID "27363857".
- Berlin_North–South_mainline wikiPageRevisionID "570781814".
- Berlin_North–South_mainline bildpfadFoto "Nordsuedfernbahn.jpg".
- Berlin_North–South_mainline deKbs "203204205".
- Berlin_North–South_mainline deStreckennr "6134".
- Berlin_North–South_mainline deStreckennr "6171".
- Berlin_North–South_mainline länge "9.053".
- Berlin_North–South_mainline pixelFoto "300".
- Berlin_North–South_mainline spurweite "1435".
- Berlin_North–South_mainline streckenklasse "F3".
- Berlin_North–South_mainline stromw "15".
- Berlin_North–South_mainline textFoto "Line between Tunnel exit and Südkreuz with an InterConnex train".
- Berlin_North–South_mainline vMax "120".
- Berlin_North–South_mainline subject Category:Railway_lines_in_Berlin.
- Berlin_North–South_mainline comment "The Berlin North-South main line (German: Nord-Süd-Fernbahn), also called the North-South link (Nord-Süd-Verbindung) called, is a railway line in Berlin, which was opened in 2006. It is an electrified line that is an important component of the “mushroom concept” (Pilzkonzept) adopted for long-distance and regional rail services through the city. Its core is an approximately 3.5 km long tunnel under the Tiergarten in Berlin.".
- Berlin_North–South_mainline label "Berlin North–South mainline".
- Berlin_North–South_mainline label "Nord-Süd-Fernbahn".
- Berlin_North–South_mainline label "Nuevo túnel ferroviario bajo el Tiergarten (Berlín)".
- Berlin_North–South_mainline label "Spoorlijn Berlijn-Wedding - Berlijn-Südkreuz".
- Berlin_North–South_mainline sameAs Berlin_North%E2%80%93South_mainline.
- Berlin_North–South_mainline sameAs Nord-Süd-Fernbahn.
- Berlin_North–South_mainline sameAs Nuevo_túnel_ferroviario_bajo_el_Tiergarten_(Berlín).
- Berlin_North–South_mainline sameAs Spoorlijn_Berlijn-Wedding_-_Berlijn-Südkreuz.
- Berlin_North–South_mainline sameAs Q477470.
- Berlin_North–South_mainline sameAs Q477470.
- Berlin_North–South_mainline wasDerivedFrom Berlin_North–South_mainline?oldid=570781814.
- Berlin_North–South_mainline depiction Nordsuedfernbahn.jpg.