Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Cedar_Creek_Wind_Farm> ?p ?o. }
Showing items 1 to 87 of
87
with 100 items per page.
- Cedar_Creek_Wind_Farm abstract "The Cedar Creek Wind Farm is a 551.3MW, 397 wind turbine facility, consists of 2 phases, Cedar Creek I and Cedar Creek II, located 13 km (8 miles) east of Grover in north-central Weld County, Colorado, which became fully operational with the completion of Cedar Creek II in 2010. The initial 300.5 megawatt (MW) Cedar Creek I wind power installation was completed on time, within budget and without incident - with the operation commencing on 21 November 2007. Cedar Creek I is an important contributor to Colorado's New Energy Economy, providing enough wind-powered electricity for 81,135 homes. The power produced from the Cedar Creek wind farm is sold to the Public Service Company of Colorado. Cedar Creek II has an additional 150.8MW of generating capacity, and was commissioned in 2010.The first phase has 221 1MW wind turbines (produced by Mitsubishi Heavy Industries) and 53 1.5MW turbines (produced by General Electric), and the second phase has an additional 53 1.6MW turbines from General Electric, and 60 2.5MW from German wind turbine supplier Nordex.The Cedar Creek Wind Farm I is owned by Cedar Creek Wind Energy LLC which is a conglomerate group with Infigen Energy owning 67% and BP Wind Energy the other 33%.[citation needed]The Cedar Creek Wind Farm II is owned by BP Wind Energy (50%) and Sempra Generation (50%). The power from the Cedar Creek 2 Wind Farm has been sold under a long-term power purchase agreement to the Public Service Company of Colorado, an Xcel Energy company. Electricity from the Cedar Creek II Wind Farm reaches the grid through approximately 20 miles of new transmission lines that connect to the Cedar Creek I Wind Farm. From there, the project utilizes an existing 76-mile (230kV) transmission line to deliver the electrical power. The Cedar Creek II project employed some 350 workers during peak construction, and some 19 jobs have been created to monitor and maintain the facility.".
- Cedar_Creek_Wind_Farm buildingStartYear "2007".
- Cedar_Creek_Wind_Farm installedCapacity "5.513E8".
- Cedar_Creek_Wind_Farm location Colorado.
- Cedar_Creek_Wind_Farm openingDate "2007-11-21".
- Cedar_Creek_Wind_Farm openingYear "2007".
- Cedar_Creek_Wind_Farm status "Operational".
- Cedar_Creek_Wind_Farm wikiPageID "15136552".
- Cedar_Creek_Wind_Farm wikiPageRevisionID "603507623".
- Cedar_Creek_Wind_Farm asOf "2011".
- Cedar_Creek_Wind_Farm commissioned "2007-11-21".
- Cedar_Creek_Wind_Farm constructionBegan "2007".
- Cedar_Creek_Wind_Farm coordinatesDisplay "inline,title".
- Cedar_Creek_Wind_Farm coordinatesType "type:landmark_region:US-CO".
- Cedar_Creek_Wind_Farm cost "US$480 million".
- Cedar_Creek_Wind_Farm developer "Infigen Energy & BP Energy".
- Cedar_Creek_Wind_Farm hasPhotoCollection Cedar_Creek_Wind_Farm.
- Cedar_Creek_Wind_Farm installedCapacity "150.8".
- Cedar_Creek_Wind_Farm installedCapacity "300.5".
- Cedar_Creek_Wind_Farm installedCapacity "551.3".
- Cedar_Creek_Wind_Farm latD "40".
- Cedar_Creek_Wind_Farm latM "52".
- Cedar_Creek_Wind_Farm latNs "N".
- Cedar_Creek_Wind_Farm latS "16".
- Cedar_Creek_Wind_Farm locale "13".
- Cedar_Creek_Wind_Farm locationMap "Colorado".
- Cedar_Creek_Wind_Farm longD "104".
- Cedar_Creek_Wind_Farm longEw "W".
- Cedar_Creek_Wind_Farm longM "5".
- Cedar_Creek_Wind_Farm longS "35".
- Cedar_Creek_Wind_Farm name "Cedar Creek Wind Farm I & II".
- Cedar_Creek_Wind_Farm onshoreElevation "1674m".
- Cedar_Creek_Wind_Farm operator "Infigen Energy and BP Wind Energy".
- Cedar_Creek_Wind_Farm owner "Cedar Creek Wind Energy, LLC".
- Cedar_Creek_Wind_Farm status "Operational".
- Cedar_Creek_Wind_Farm turbineManu "Mitsubishi, GE, Nordex".
- Cedar_Creek_Wind_Farm turbineModel "221".
- Cedar_Creek_Wind_Farm turbineModel "53".
- Cedar_Creek_Wind_Farm turbineModel "60".
- Cedar_Creek_Wind_Farm turbineModel "63".
- Cedar_Creek_Wind_Farm windFarmType "Onshore".
- Cedar_Creek_Wind_Farm windTurbines "123".
- Cedar_Creek_Wind_Farm windTurbines "274".
- Cedar_Creek_Wind_Farm windTurbines "397".
- Cedar_Creek_Wind_Farm subject Category:BP_buildings_and_structures.
- Cedar_Creek_Wind_Farm subject Category:Buildings_and_structures_in_Weld_County,_Colorado.
- Cedar_Creek_Wind_Farm subject Category:Energy_infrastructure_completed_in_2007.
- Cedar_Creek_Wind_Farm subject Category:Energy_infrastructure_completed_in_2010.
- Cedar_Creek_Wind_Farm subject Category:Wind_farms_in_Colorado.
- Cedar_Creek_Wind_Farm point "40.87111111111111 -104.09305555555555".
- Cedar_Creek_Wind_Farm type Artifact100021939.
- Cedar_Creek_Wind_Farm type EnergyResourceFacilitiesInColorado.
- Cedar_Creek_Wind_Farm type Facility103315023.
- Cedar_Creek_Wind_Farm type Object100002684.
- Cedar_Creek_Wind_Farm type PhysicalEntity100001930.
- Cedar_Creek_Wind_Farm type PowerStation103996655.
- Cedar_Creek_Wind_Farm type Station104306080.
- Cedar_Creek_Wind_Farm type Structure104341686.
- Cedar_Creek_Wind_Farm type Tower104460130.
- Cedar_Creek_Wind_Farm type TowersInColorado.
- Cedar_Creek_Wind_Farm type Whole100003553.
- Cedar_Creek_Wind_Farm type WindFarm104586761.
- Cedar_Creek_Wind_Farm type WindFarmsInColorado.
- Cedar_Creek_Wind_Farm type WindFarmsInTheUnitedStates.
- Cedar_Creek_Wind_Farm type YagoGeoEntity.
- Cedar_Creek_Wind_Farm type YagoPermanentlyLocatedEntity.
- Cedar_Creek_Wind_Farm type ArchitecturalStructure.
- Cedar_Creek_Wind_Farm type Infrastructure.
- Cedar_Creek_Wind_Farm type Place.
- Cedar_Creek_Wind_Farm type PowerStation.
- Cedar_Creek_Wind_Farm type Wikidata:Q532.
- Cedar_Creek_Wind_Farm type Place.
- Cedar_Creek_Wind_Farm type Location.
- Cedar_Creek_Wind_Farm type _Feature.
- Cedar_Creek_Wind_Farm comment "The Cedar Creek Wind Farm is a 551.3MW, 397 wind turbine facility, consists of 2 phases, Cedar Creek I and Cedar Creek II, located 13 km (8 miles) east of Grover in north-central Weld County, Colorado, which became fully operational with the completion of Cedar Creek II in 2010. The initial 300.5 megawatt (MW) Cedar Creek I wind power installation was completed on time, within budget and without incident - with the operation commencing on 21 November 2007.".
- Cedar_Creek_Wind_Farm label "Cedar Creek Wind Farm".
- Cedar_Creek_Wind_Farm label "Parc éolien de Cedar Creek".
- Cedar_Creek_Wind_Farm sameAs Parc_éolien_de_Cedar_Creek.
- Cedar_Creek_Wind_Farm sameAs m.03hjpwr.
- Cedar_Creek_Wind_Farm sameAs Q5056650.
- Cedar_Creek_Wind_Farm sameAs Q5056650.
- Cedar_Creek_Wind_Farm sameAs Cedar_Creek_Wind_Farm.
- Cedar_Creek_Wind_Farm lat "40.87111111111111".
- Cedar_Creek_Wind_Farm long "-104.09305555555555".
- Cedar_Creek_Wind_Farm wasDerivedFrom Cedar_Creek_Wind_Farm?oldid=603507623.
- Cedar_Creek_Wind_Farm isPrimaryTopicOf Cedar_Creek_Wind_Farm.
- Cedar_Creek_Wind_Farm name "Cedar Creek Wind Farm I & II".