Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Phased_implementation> ?p ?o. }
Showing items 1 to 14 of
14
with 100 items per page.
- Phased_implementation abstract "Phased implementation is a method of changing from an existing system to a new one. Phased implementation is a changeover process that takes place in stages.As an example, think of a supermarket. In this supermarket the checkout system is being upgraded to a newer version. Imagine that only the checkout counters of the vegetable section are changed over to the new system, while the other counters carry on with the old system. If the new system does not work properly, it won't matter because only a small part of the supermarket has been computerised. If it does work, staff can take turns working on the vegetable counters to get some practice using the new system. After the vegetables section is working perfectly, the meat section might be next, then the confectionery section, and so on. Eventually all the various counters in the supermarket system would have been phased in, and everything would be running. This takes a long time as there are two systems working until the changeover is completed. However, the supermarket is never in danger of having to shut and the staff are all able to get plenty of training in operating the new system, so it is a much friendlier method.Other methods of system changeover include direct changeover and parallel running.".
- Phased_implementation thumbnail Phased_implementation.png?width=300.
- Phased_implementation wikiPageID "32730583".
- Phased_implementation wikiPageRevisionID "562720231".
- Phased_implementation hasPhotoCollection Phased_implementation.
- Phased_implementation subject Category:Project_management.
- Phased_implementation comment "Phased implementation is a method of changing from an existing system to a new one. Phased implementation is a changeover process that takes place in stages.As an example, think of a supermarket. In this supermarket the checkout system is being upgraded to a newer version. Imagine that only the checkout counters of the vegetable section are changed over to the new system, while the other counters carry on with the old system.".
- Phased_implementation label "Phased implementation".
- Phased_implementation sameAs m.0h3xysq.
- Phased_implementation sameAs Q7180975.
- Phased_implementation sameAs Q7180975.
- Phased_implementation wasDerivedFrom Phased_implementation?oldid=562720231.
- Phased_implementation depiction Phased_implementation.png.
- Phased_implementation isPrimaryTopicOf Phased_implementation.