Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Pitești–Craiova_Motorway> ?p ?o. }
Showing items 1 to 29 of
29
with 100 items per page.
- Pitești–Craiova_Motorway length "121.0".
- Pitești–Craiova_Motorway abstract "The Pitești-Craiova Motorway (Romanian: Autostrada Pitești–Craiova) is a planned motorway in the south-western part of Romania. It will connect the cities of Pitești, Slatina and Craiova. It is planned to be 121 km long, with an estimated total cost of 1.66 billion euro, and reportedly shall be completed until 2016.Its construction was tendered as a concession contract in March 2013, that shall be awarded until December 2013. It shall also be decided whether it will be built as a motorway or an expressway.".
- Pitești–Craiova_Motorway thumbnail Romania_Motorway_A12.svg?width=300.
- Pitești–Craiova_Motorway wikiPageID "39509004".
- Pitești–Craiova_Motorway wikiPageRevisionID "603281175".
- Pitești–Craiova_Motorway country "ROU".
- Pitești–Craiova_Motorway lengthKm "121".
- Pitești–Craiova_Motorway maint "Compania Națională de Autostrăzi și Drumuri Naționale din România".
- Pitești–Craiova_Motorway map "Romania Motorway A12.svg".
- Pitești–Craiova_Motorway name "Pitești–Craiova Motorway".
- Pitești–Craiova_Motorway terminusA "Pitești".
- Pitești–Craiova_Motorway terminusB "Craiova".
- Pitești–Craiova_Motorway subject Category:Motorways_in_Romania.
- Pitești–Craiova_Motorway subject Category:Proposed_roads_in_Romania.
- Pitești–Craiova_Motorway type ArchitecturalStructure.
- Pitești–Craiova_Motorway type Infrastructure.
- Pitești–Craiova_Motorway type Place.
- Pitești–Craiova_Motorway type Road.
- Pitești–Craiova_Motorway type RouteOfTransportation.
- Pitești–Craiova_Motorway type Wikidata:Q532.
- Pitești–Craiova_Motorway type Place.
- Pitești–Craiova_Motorway type Location.
- Pitești–Craiova_Motorway comment "The Pitești-Craiova Motorway (Romanian: Autostrada Pitești–Craiova) is a planned motorway in the south-western part of Romania. It will connect the cities of Pitești, Slatina and Craiova. It is planned to be 121 km long, with an estimated total cost of 1.66 billion euro, and reportedly shall be completed until 2016.Its construction was tendered as a concession contract in March 2013, that shall be awarded until December 2013.".
- Pitești–Craiova_Motorway label "Pitești–Craiova Motorway".
- Pitești–Craiova_Motorway sameAs Pite%C8%99ti%E2%80%93Craiova_Motorway.
- Pitești–Craiova_Motorway sameAs Q13426065.
- Pitești–Craiova_Motorway sameAs Q13426065.
- Pitești–Craiova_Motorway wasDerivedFrom Pitești–Craiova_Motorway?oldid=603281175.
- Pitești–Craiova_Motorway depiction Romania_Motorway_A12.svg.