Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Pre-determined_overhead_rate> ?p ?o. }
Showing items 1 to 19 of
19
with 100 items per page.
- Pre-determined_overhead_rate abstract "A pre-determined overhead rate is the rate used to apply manufacturing overhead to work-in-process inventory. The pre-determined overhead rate is calculated before the period begins. The first step is to estimate the amount of the activity base that will be required to support operations in the upcoming period. The second step is to estimate the total manufacturing cost at that level of activity. The third step is to compute the predetermined overhead rate by dividing the estimated total manufacturing overhead costs by the estimated total amount of cost driver or activity base. Common activity bases used in the calculation include direct labor costs, direct labor hours, or machine hours.This is related to an activity rate which is a similar calculation used in Activity-based costing. A pre-determined overhead rate is normally the term when using a single, plant-wide base to calculate and apply overhead. Overhead is then applied by multiplying the pre-determined overhead rate by the actual driver units. Any difference between applied overhead and the amount of overhead actually incurred is called over- or under-applied overhead.".
- Pre-determined_overhead_rate thumbnail PredeterminedOverheadRate.jpg?width=300.
- Pre-determined_overhead_rate wikiPageExternalLink manufacturing-overhead.html.
- Pre-determined_overhead_rate wikiPageExternalLink chpt_notes_20.htm.
- Pre-determined_overhead_rate wikiPageExternalLink predetermined-overhead-rate.
- Pre-determined_overhead_rate wikiPageID "2270140".
- Pre-determined_overhead_rate wikiPageRevisionID "569981380".
- Pre-determined_overhead_rate hasPhotoCollection Pre-determined_overhead_rate.
- Pre-determined_overhead_rate subject Category:Business_terms.
- Pre-determined_overhead_rate subject Category:Management_accounting.
- Pre-determined_overhead_rate comment "A pre-determined overhead rate is the rate used to apply manufacturing overhead to work-in-process inventory. The pre-determined overhead rate is calculated before the period begins. The first step is to estimate the amount of the activity base that will be required to support operations in the upcoming period. The second step is to estimate the total manufacturing cost at that level of activity.".
- Pre-determined_overhead_rate label "Pre-determined overhead rate".
- Pre-determined_overhead_rate label "معدل التكاليف غير المباشرة".
- Pre-determined_overhead_rate sameAs m.06_q80.
- Pre-determined_overhead_rate sameAs Q12244043.
- Pre-determined_overhead_rate sameAs Q12244043.
- Pre-determined_overhead_rate wasDerivedFrom Pre-determined_overhead_rate?oldid=569981380.
- Pre-determined_overhead_rate depiction PredeterminedOverheadRate.jpg.
- Pre-determined_overhead_rate isPrimaryTopicOf Pre-determined_overhead_rate.