Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Corridor_X-1> ?p ?o. }
Showing items 1 to 66 of
66
with 100 items per page.
- Corridor_X-1 length "80.59594752".
- Corridor_X-1 abstract "Corridor X-1 or the Birmingham Northern Beltline is the long-awaited 50.08-mile (80.60 km) northern by-pass route around Birmingham, Alabama through northern and western Jefferson County now under construction and slated to be completed by 2049. Along with the existing I-459, the Northern Beltline would complete the bypass loop of central Birmingham for all interstate traffic.Current plans for the route have it connecting at I-459's current southern terminus in Bessemer with I-59 at approximately mile marker 147 to the northeast of Trussville near Argo. Additional studies are underway to determine the economic feasibility to continue the route from its proposed northern terminus to I-20 in the Leeds/Moody area.The route has been designated as the Appalachian Regional Commission, High Priority Corridor X-1, State Route 959 and Interstate 422.".
- Corridor_X-1 length "80595.94752".
- Corridor_X-1 routeEnd Argo,_Alabama.
- Corridor_X-1 routeEndDirection "North".
- Corridor_X-1 routeJunction Adamsville,_Alabama.
- Corridor_X-1 routeJunction Morris,_Alabama.
- Corridor_X-1 routeJunction Pinson,_Alabama.
- Corridor_X-1 routeJunction Sylvan_Springs,_Alabama.
- Corridor_X-1 routeNumber "422".
- Corridor_X-1 routeStart Bessemer,_Alabama.
- Corridor_X-1 routeStartDirection "South".
- Corridor_X-1 routeTypeAbbreviation "Future".
- Corridor_X-1 thumbnail I-422.svg?width=300.
- Corridor_X-1 wikiPageExternalLink BNB.
- Corridor_X-1 wikiPageExternalLink focus1.html.
- Corridor_X-1 wikiPageExternalLink daily22.html.
- Corridor_X-1 wikiPageExternalLink corr28.html.
- Corridor_X-1 wikiPageExternalLink northern-beltline.
- Corridor_X-1 wikiPageID "8422295".
- Corridor_X-1 wikiPageRevisionID "597476439".
- Corridor_X-1 alternateName "Corridor X-1".
- Corridor_X-1 directionA "South".
- Corridor_X-1 directionB "North".
- Corridor_X-1 hasPhotoCollection Corridor_X-1.
- Corridor_X-1 headerType "UC".
- Corridor_X-1 junction "at Adamsville".
- Corridor_X-1 junction "at Morris".
- Corridor_X-1 junction "at Pinson".
- Corridor_X-1 junction "at Sylvan Springs".
- Corridor_X-1 lengthMi "50.08".
- Corridor_X-1 lengthRound "2".
- Corridor_X-1 markerImage File:I-422.svg.
- Corridor_X-1 nextRoute "1".
- Corridor_X-1 nextType "SR".
- Corridor_X-1 previousRoute "759".
- Corridor_X-1 previousType "SR".
- Corridor_X-1 route "422".
- Corridor_X-1 state "AL".
- Corridor_X-1 terminusA "south of Bessemer".
- Corridor_X-1 terminusB "near Argo".
- Corridor_X-1 type "Future".
- Corridor_X-1 wordnet_type synset-road-noun-1.
- Corridor_X-1 subject Category:Appalachian_Development_Highway_System.
- Corridor_X-1 subject Category:Proposed_state_highways_in_the_United_States.
- Corridor_X-1 subject Category:Transportation_in_Alabama.
- Corridor_X-1 subject Category:Transportation_in_Jefferson_County,_Alabama.
- Corridor_X-1 type ArchitecturalStructure.
- Corridor_X-1 type Infrastructure.
- Corridor_X-1 type Place.
- Corridor_X-1 type Road.
- Corridor_X-1 type RouteOfTransportation.
- Corridor_X-1 type Wikidata:Q532.
- Corridor_X-1 type Place.
- Corridor_X-1 type Facility_Construct.
- Corridor_X-1 type Street_Generic.
- Corridor_X-1 type Location.
- Corridor_X-1 comment "Corridor X-1 or the Birmingham Northern Beltline is the long-awaited 50.08-mile (80.60 km) northern by-pass route around Birmingham, Alabama through northern and western Jefferson County now under construction and slated to be completed by 2049.".
- Corridor_X-1 label "Corridor X-1".
- Corridor_X-1 sameAs m.0272wcx.
- Corridor_X-1 sameAs Q876733.
- Corridor_X-1 sameAs Q876733.
- Corridor_X-1 wasDerivedFrom Corridor_X-1?oldid=597476439.
- Corridor_X-1 depiction I-422.svg.
- Corridor_X-1 isPrimaryTopicOf Corridor_X-1.
- Corridor_X-1 name "Corridor X-1".