Matches in Library of Congress for { <http://lccn.loc.gov/2010049003> ?p ?o. }
Showing items 1 to 24 of
24
with 100 items per page.
- 2010049003 contributor B11795437.
- 2010049003 created "c2011.".
- 2010049003 date "2011".
- 2010049003 date "c2011.".
- 2010049003 dateCopyrighted "c2011.".
- 2010049003 description "Includes bibliographical references and index.".
- 2010049003 description "Why conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis.".
- 2010049003 extent "xix, 218 p. :".
- 2010049003 identifier "0566091666 (hbk. : alk. paper)".
- 2010049003 identifier "1409428125 (ebook)".
- 2010049003 identifier "9780566091667 (hbk. : alk. paper)".
- 2010049003 identifier "9781409428121 (ebook)".
- 2010049003 issued "2011".
- 2010049003 issued "c2011.".
- 2010049003 language "eng".
- 2010049003 publisher "Farnham, Surrey ; Burlington, VT : Gower,".
- 2010049003 subject "658.15/52 22".
- 2010049003 subject "Costs, Industrial.".
- 2010049003 subject "HD69.P75 H85 2011".
- 2010049003 subject "Project management Cost control.".
- 2010049003 subject "Risk assessment.".
- 2010049003 tableOfContents "Why conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis.".
- 2010049003 title "Integrated cost-schedule risk analysis / David Hulett.".
- 2010049003 type "text".