- 2013412391 abstract "The National Concrete Pavement Technology Center, Iowa Department of Transportation, and Federal Highway Administration set out to demonstrate and document the design and construction of portland cement concrete (PCC) overlays on two-lane roadways while maintaining two-way traffic. An 18.82 mile project was selected for 2011 construction in northeast Iowa on US 18 between Fredericksburg and West Union. This report documents planning, design, and construction of the project and lessons learned. The work included the addition of subdrains, full-depth patching, bridge approach replacement, and drainage structural repair and cleaning prior to overlay construction. The paving involved surface preparation by milling to grade and the placement of a 4.5 inch PCC overlay and 4 foot of widening to the existing pavement. In addition, the report makes recommendations on ways to improve the process for future concrete overlays.".
- 2013412391 alternative "Iowa task report US 18 concrete overlay construction under traffic.".
- 2013412391 contributor B12804171.
- 2013412391 created "2012.".
- 2013412391 date "2012".
- 2013412391 date "2012.".
- 2013412391 dateCopyrighted "2012.".
- 2013412391 description "Iowa Task Report.".
- 2013412391 description "Sponsored by the U.S. Federal Highway Administration DTFH-61-06-H-00011 (W13)".
- 2013412391 description "The National Concrete Pavement Technology Center, Iowa Department of Transportation, and Federal Highway Administration set out to demonstrate and document the design and construction of portland cement concrete (PCC) overlays on two-lane roadways while maintaining two-way traffic. An 18.82 mile project was selected for 2011 construction in northeast Iowa on US 18 between Fredericksburg and West Union. This report documents planning, design, and construction of the project and lessons learned. The work included the addition of subdrains, full-depth patching, bridge approach replacement, and drainage structural repair and cleaning prior to overlay construction. The paving involved surface preparation by milling to grade and the placement of a 4.5 inch PCC overlay and 4 foot of widening to the existing pavement. In addition, the report makes recommendations on ways to improve the process for future concrete overlays.".
- 2013412391 extent "xvii, 104 p. :".
- 2013412391 hasFormat "Also available via the Internet at: http://www.intrans.iastate.edu/research/documents/research-reports/US_18_overlay_construction_web.pdf".
- 2013412391 identifier US_18_overlay_construction_web.pdf.
- 2013412391 isFormatOf "Also available via the Internet at: http://www.intrans.iastate.edu/research/documents/research-reports/US_18_overlay_construction_web.pdf".
- 2013412391 issued "2012".
- 2013412391 issued "2012.".
- 2013412391 language "eng".
- 2013412391 publisher "Ames, Iowa : National Concrete Pavement Technology Center, Iowa State University,".
- 2013412391 relation "Also available via the Internet at: http://www.intrans.iastate.edu/research/documents/research-reports/US_18_overlay_construction_web.pdf".
- 2013412391 spatial "Iowa".
- 2013412391 subject "Pavements, Concrete Iowa Maintenance and repair.".
- 2013412391 subject "TE220.3 .C32 2012".
- 2013412391 title "Concrete overlay field application program : Iowa task report US 18 concrete overlay construction under traffic / James K. Cable.".
- 2013412391 title "Iowa task report US 18 concrete overlay construction under traffic.".
- 2013412391 type "text".