Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Baglihar_Dam> ?p ?o. }
Showing items 1 to 90 of
90
with 100 items per page.
- Baglihar_Dam length "0.317".
- Baglihar_Dam abstract "Baglihar Dam (Hindi: बगलिहार बाँध Baglihār Bāndh), also known as Baglihar Hydroelectric Power Project, is a run-of-the-river power project on the Chenab River in the southern Doda district of the Indian state of Jammu and Kashmir. This project was conceived in 1992, approved in 1996 and construction began in 1999. The project is estimated to cost USD $1 billion. The first phase of the Baglihar Dam was completed in 2004. With the second phase completed on 10 October 2008, Prime Minister Manmohan Singh of India dedicated the 900-MW Baglihar hydroelectric power project to the nation.".
- Baglihar_Dam buildingStartYear "1999".
- Baglihar_Dam country India.
- Baglihar_Dam description "Gravity".
- Baglihar_Dam elevation "844.5".
- Baglihar_Dam height "144.0".
- Baglihar_Dam length "317.0".
- Baglihar_Dam location Jammu_and_Kashmir.
- Baglihar_Dam openingYear "2008".
- Baglihar_Dam river Chenab_River.
- Baglihar_Dam thumbnail Baglihar_Dam_Chenab_River.JPG?width=300.
- Baglihar_Dam volume "1800000.0".
- Baglihar_Dam wikiPageExternalLink 116891-3.html.
- Baglihar_Dam wikiPageExternalLink IndusWatersTreaty1960.pdf.
- Baglihar_Dam wikiPageID "5775309".
- Baglihar_Dam wikiPageRevisionID "600535133".
- Baglihar_Dam constructionBegan "1999".
- Baglihar_Dam coordinatesDisplay "inline,title".
- Baglihar_Dam coordinatesType "type:landmark".
- Baglihar_Dam country India.
- Baglihar_Dam damCrosses Chenab_River.
- Baglihar_Dam damType "Gravity".
- Baglihar_Dam hasPhotoCollection Baglihar_Dam.
- Baglihar_Dam latD "33".
- Baglihar_Dam latM "9".
- Baglihar_Dam latNs "N".
- Baglihar_Dam latS "43".
- Baglihar_Dam location Jammu_and_Kashmir.
- Baglihar_Dam locationMap "India Jammu and Kashmir".
- Baglihar_Dam longD "75".
- Baglihar_Dam longEw "E".
- Baglihar_Dam longM "19".
- Baglihar_Dam longS "40".
- Baglihar_Dam name "Baglihar Dam".
- Baglihar_Dam opening "2008".
- Baglihar_Dam plantCapacity "Stage I: 450 MW".
- Baglihar_Dam plantCapacity "Stage II: 450 MW".
- Baglihar_Dam plantCapacity "Total: 900 MW".
- Baglihar_Dam plantCommission "Stage I: 2005".
- Baglihar_Dam plantCommission "Stage II: 2008".
- Baglihar_Dam plantTurbines "Stage I: 3 x 150 MW Francis-type".
- Baglihar_Dam plantTurbines "Stage II: 3 x 150 MW Francis-type".
- Baglihar_Dam subject Category:Dam_controversies.
- Baglihar_Dam subject Category:Dams_completed_in_2004.
- Baglihar_Dam subject Category:Dams_in_Jammu_and_Kashmir.
- Baglihar_Dam subject Category:Dams_on_the_Chenab_River.
- Baglihar_Dam subject Category:Hydroelectric_power_stations_in_Jammu_and_Kashmir.
- Baglihar_Dam subject Category:Run-of-the-river_power_stations.
- Baglihar_Dam point "33.161944444444444 75.32777777777778".
- Baglihar_Dam type Artifact100021939.
- Baglihar_Dam type Barrier102796623.
- Baglihar_Dam type Dam103160309.
- Baglihar_Dam type DamsInJammuAndKashmir.
- Baglihar_Dam type Facility103315023.
- Baglihar_Dam type HydroelectricPowerStationsInJammuAndKashmir.
- Baglihar_Dam type Object100002684.
- Baglihar_Dam type Obstruction103839993.
- Baglihar_Dam type PhysicalEntity100001930.
- Baglihar_Dam type PowerStation103996655.
- Baglihar_Dam type Run-of-the-riverPowerStations.
- Baglihar_Dam type Station104306080.
- Baglihar_Dam type Structure104341686.
- Baglihar_Dam type Whole100003553.
- Baglihar_Dam type YagoGeoEntity.
- Baglihar_Dam type YagoPermanentlyLocatedEntity.
- Baglihar_Dam type ArchitecturalStructure.
- Baglihar_Dam type Dam.
- Baglihar_Dam type Infrastructure.
- Baglihar_Dam type Place.
- Baglihar_Dam type Wikidata:Q532.
- Baglihar_Dam type Place.
- Baglihar_Dam type Location.
- Baglihar_Dam type _Feature.
- Baglihar_Dam comment "Baglihar Dam (Hindi: बगलिहार बाँध Baglihār Bāndh), also known as Baglihar Hydroelectric Power Project, is a run-of-the-river power project on the Chenab River in the southern Doda district of the Indian state of Jammu and Kashmir. This project was conceived in 1992, approved in 1996 and construction began in 1999. The project is estimated to cost USD $1 billion. The first phase of the Baglihar Dam was completed in 2004.".
- Baglihar_Dam label "Baglihar Dam".
- Baglihar_Dam label "Baglihar-Talsperre".
- Baglihar_Dam label "Barrage de Baglihar".
- Baglihar_Dam sameAs Baglihar-Talsperre.
- Baglihar_Dam sameAs Barrage_de_Baglihar.
- Baglihar_Dam sameAs m.0f3yy_.
- Baglihar_Dam sameAs Q460350.
- Baglihar_Dam sameAs Q460350.
- Baglihar_Dam sameAs Baglihar_Dam.
- Baglihar_Dam lat "33.161944444444444".
- Baglihar_Dam long "75.32777777777778".
- Baglihar_Dam wasDerivedFrom Baglihar_Dam?oldid=600535133.
- Baglihar_Dam depiction Baglihar_Dam_Chenab_River.JPG.
- Baglihar_Dam isPrimaryTopicOf Baglihar_Dam.
- Baglihar_Dam name "Baglihar Dam".