Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Bonyic_Dam> ?p ?o. }
Showing items 1 to 56 of
56
with 100 items per page.
- Bonyic_Dam length "0.165".
- Bonyic_Dam abstract "The Bonyic Dam is a proposed gravity dam on the Bonyic River, a tributary of the Teribe River about 24 km (15 mi) southwest of Changuinola in the Bocas del Toro province of northwesternPanama. The project seeks to produce hydroelectricity at a 32.64 MW power station about 3.8 km (2 mi) downstream of the dam. The builder and operator is Hidroécología Teribe (HET) S.A., a private Panamanian company whose majority stockholder is Empresas Públicas de Medellín (EPM), a public utility company owned by the municipal government of Medellín, Colombia. The dam construction has been subject to controversies that have resulted in the removal of its funding by the Inter-American Development Bank. The Bonyic dam would obstruct access for migrating fish to La Amistad International Park. Members of the local indigenous people, the Naso, have periodically blockaded the single road to delay construction for a cumulative total of four years.".
- Bonyic_Dam country Panama.
- Bonyic_Dam description "Gravity, roller-compacted concrete".
- Bonyic_Dam elevation "244.0".
- Bonyic_Dam height "37.0".
- Bonyic_Dam length "165.0".
- Bonyic_Dam location Changuinola.
- Bonyic_Dam purpose "Power".
- Bonyic_Dam river Bonyic_River.
- Bonyic_Dam status "P".
- Bonyic_Dam wikiPageID "41811548".
- Bonyic_Dam wikiPageRevisionID "595091789".
- Bonyic_Dam coordinatesDisplay "inline,title".
- Bonyic_Dam coordinatesType "type:landmark".
- Bonyic_Dam country "Panama".
- Bonyic_Dam damCrosses Bonyic_River.
- Bonyic_Dam damType "Gravity, roller-compacted concrete".
- Bonyic_Dam latD "9".
- Bonyic_Dam latM "19".
- Bonyic_Dam latNs "N".
- Bonyic_Dam latS "28.74".
- Bonyic_Dam location Changuinola.
- Bonyic_Dam locationMap "Panama".
- Bonyic_Dam longD "82".
- Bonyic_Dam longEw "W".
- Bonyic_Dam longM "38".
- Bonyic_Dam longS "28.7".
- Bonyic_Dam name "Bonyic Dam".
- Bonyic_Dam plantCapacity "32.64".
- Bonyic_Dam plantTurbines "3".
- Bonyic_Dam purpose "Power".
- Bonyic_Dam status "P".
- Bonyic_Dam subject Category:Dams_in_Panama.
- Bonyic_Dam subject Category:Hydroelectric_power_stations_in_Panama.
- Bonyic_Dam subject Category:Indigenous_rights_protests.
- Bonyic_Dam subject Category:Run-of-the-river_power_stations.
- Bonyic_Dam point "9.32465 -82.64130555555556".
- Bonyic_Dam type ArchitecturalStructure.
- Bonyic_Dam type Dam.
- Bonyic_Dam type Infrastructure.
- Bonyic_Dam type Place.
- Bonyic_Dam type Wikidata:Q532.
- Bonyic_Dam type Place.
- Bonyic_Dam type Location.
- Bonyic_Dam type _Feature.
- Bonyic_Dam comment "The Bonyic Dam is a proposed gravity dam on the Bonyic River, a tributary of the Teribe River about 24 km (15 mi) southwest of Changuinola in the Bocas del Toro province of northwesternPanama. The project seeks to produce hydroelectricity at a 32.64 MW power station about 3.8 km (2 mi) downstream of the dam.".
- Bonyic_Dam label "Bonyic Dam".
- Bonyic_Dam sameAs m.0_lftpn.
- Bonyic_Dam sameAs Q16844431.
- Bonyic_Dam sameAs Q16844431.
- Bonyic_Dam lat "9.32465".
- Bonyic_Dam long "-82.64130555555556".
- Bonyic_Dam wasDerivedFrom Bonyic_Dam?oldid=595091789.
- Bonyic_Dam isPrimaryTopicOf Bonyic_Dam.
- Bonyic_Dam name "Bonyic Dam".