Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Central_Electricity_Board> ?p ?o. }
Showing items 1 to 24 of
24
with 100 items per page.
- Central_Electricity_Board abstract "The United Kingdom Central Electricity Board was set up under The Electricity (Supply) Act 1926 to standardise the nation's electricity supply. At that time, the industry consisted of more than 600 electricity supply companies and local authority undertakings, and different areas operated at different voltages and frequencies (including DC in some places). The board's first chairman was Andrew Duncan.The CEB established the UK's first synchronised AC grid, running at 132 kilovolts and 50 Hertz, which by 1933 was a collection of local grids, with emergency interlinks, covering most of England. This started operating as a national system, the National Grid, in 1938. The CEB ceased to exist when the grid was nationalised by the Electricity Act 1947 and taken over by the British Electricity Authority.The CEB coexisted with the Electricity Commissioners, an industry regulator responsible to the Ministry of Transport.".
- Central_Electricity_Board wikiPageExternalLink 214c03.pdf.
- Central_Electricity_Board wikiPageID "1916848".
- Central_Electricity_Board wikiPageRevisionID "544016236".
- Central_Electricity_Board hasPhotoCollection Central_Electricity_Board.
- Central_Electricity_Board subject Category:Electric_power_in_the_United_Kingdom.
- Central_Electricity_Board subject Category:Electricity_authorities.
- Central_Electricity_Board type Abstraction100002137.
- Central_Electricity_Board type Attribute100024264.
- Central_Electricity_Board type Authority105196582.
- Central_Electricity_Board type Control105196375.
- Central_Electricity_Board type ElectricityAuthorities.
- Central_Electricity_Board type Power105190804.
- Central_Electricity_Board type Quality104723816.
- Central_Electricity_Board comment "The United Kingdom Central Electricity Board was set up under The Electricity (Supply) Act 1926 to standardise the nation's electricity supply. At that time, the industry consisted of more than 600 electricity supply companies and local authority undertakings, and different areas operated at different voltages and frequencies (including DC in some places).".
- Central_Electricity_Board label "Central Electricity Board".
- Central_Electricity_Board label "中央電力庁".
- Central_Electricity_Board sameAs 中央電力庁.
- Central_Electricity_Board sameAs m.065ydb.
- Central_Electricity_Board sameAs Q5061025.
- Central_Electricity_Board sameAs Q5061025.
- Central_Electricity_Board sameAs Central_Electricity_Board.
- Central_Electricity_Board wasDerivedFrom Central_Electricity_Board?oldid=544016236.
- Central_Electricity_Board isPrimaryTopicOf Central_Electricity_Board.