Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Construction_of_the_Trans-Alaska_Pipeline_System> ?p ?o. }
Showing items 1 to 35 of
35
with 100 items per page.
- Construction_of_the_Trans-Alaska_Pipeline_System abstract "The construction of the Trans-Alaska Pipeline System, largely completed between 1975-77 from Prudhoe Bay to Valdez, Alaska, created an oil pipeline of more than 800 miles of pipe, 11 pump stations, and a new tanker port. Built largely on permafrost, the $8 billion effort required tens of thousands of people, often working in extreme temperatures and conditions; the invention of specialized construction techniques; and the construction of a new road, the Dalton Highway. The first section of pipe was laid in 1975 after more than five years of legal and political arguments. Allegations of faulty welds drew intense scrutiny from local and national observers. A culture grew around the unique working conditions involved in constructing the pipeline, and each union that worked on the project had a different function and stereotype. 32 Alyeska Pipeline Service Company employees or contract workers were killed during the project. The main construction effort lasted until 1977; the first barrel of oil was delivered on July 28 of that year. Several more pump stations, added as oil flow increased, were completed through 1980.".
- Construction_of_the_Trans-Alaska_Pipeline_System thumbnail 800px-Trans_Alaska_Pipeline_Denali_fault_shift.JPG?width=300.
- Construction_of_the_Trans-Alaska_Pipeline_System wikiPageExternalLink FINALfacts%202007.pdf.
- Construction_of_the_Trans-Alaska_Pipeline_System wikiPageExternalLink Factbook09_6.30.pdf.
- Construction_of_the_Trans-Alaska_Pipeline_System wikiPageID "24084810".
- Construction_of_the_Trans-Alaska_Pipeline_System wikiPageRevisionID "593377963".
- Construction_of_the_Trans-Alaska_Pipeline_System hasPhotoCollection Construction_of_the_Trans-Alaska_Pipeline_System.
- Construction_of_the_Trans-Alaska_Pipeline_System subject Category:1975_in_Alaska.
- Construction_of_the_Trans-Alaska_Pipeline_System subject Category:1976_in_Alaska.
- Construction_of_the_Trans-Alaska_Pipeline_System subject Category:1977_in_Alaska.
- Construction_of_the_Trans-Alaska_Pipeline_System subject Category:History_of_Alaska.
- Construction_of_the_Trans-Alaska_Pipeline_System subject Category:Trans-Alaska_Pipeline_System.
- Construction_of_the_Trans-Alaska_Pipeline_System type Artifact100021939.
- Construction_of_the_Trans-Alaska_Pipeline_System type Conduit103089014.
- Construction_of_the_Trans-Alaska_Pipeline_System type Object100002684.
- Construction_of_the_Trans-Alaska_Pipeline_System type OilPipeline103844459.
- Construction_of_the_Trans-Alaska_Pipeline_System type OilPipelinesInTheUnitedStates.
- Construction_of_the_Trans-Alaska_Pipeline_System type Passage103895293.
- Construction_of_the_Trans-Alaska_Pipeline_System type PhysicalEntity100001930.
- Construction_of_the_Trans-Alaska_Pipeline_System type Pipe103944672.
- Construction_of_the_Trans-Alaska_Pipeline_System type Pipeline103946325.
- Construction_of_the_Trans-Alaska_Pipeline_System type Tube104493505.
- Construction_of_the_Trans-Alaska_Pipeline_System type Way104564698.
- Construction_of_the_Trans-Alaska_Pipeline_System type Whole100003553.
- Construction_of_the_Trans-Alaska_Pipeline_System type YagoGeoEntity.
- Construction_of_the_Trans-Alaska_Pipeline_System type YagoPermanentlyLocatedEntity.
- Construction_of_the_Trans-Alaska_Pipeline_System comment "The construction of the Trans-Alaska Pipeline System, largely completed between 1975-77 from Prudhoe Bay to Valdez, Alaska, created an oil pipeline of more than 800 miles of pipe, 11 pump stations, and a new tanker port. Built largely on permafrost, the $8 billion effort required tens of thousands of people, often working in extreme temperatures and conditions; the invention of specialized construction techniques; and the construction of a new road, the Dalton Highway.".
- Construction_of_the_Trans-Alaska_Pipeline_System label "Construction of the Trans-Alaska Pipeline System".
- Construction_of_the_Trans-Alaska_Pipeline_System sameAs m.07kfq5k.
- Construction_of_the_Trans-Alaska_Pipeline_System sameAs Q5164475.
- Construction_of_the_Trans-Alaska_Pipeline_System sameAs Q5164475.
- Construction_of_the_Trans-Alaska_Pipeline_System sameAs Construction_of_the_Trans-Alaska_Pipeline_System.
- Construction_of_the_Trans-Alaska_Pipeline_System wasDerivedFrom Construction_of_the_Trans-Alaska_Pipeline_System?oldid=593377963.
- Construction_of_the_Trans-Alaska_Pipeline_System depiction 800px-Trans_Alaska_Pipeline_Denali_fault_shift.JPG.
- Construction_of_the_Trans-Alaska_Pipeline_System isPrimaryTopicOf Construction_of_the_Trans-Alaska_Pipeline_System.