Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Contingency_allowance> ?p ?o. }
Showing items 1 to 13 of
13
with 100 items per page.
- Contingency_allowance abstract "The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs.The concept was developed by Charles Bedaux.".
- Contingency_allowance wikiPageID "30843289".
- Contingency_allowance wikiPageRevisionID "576956784".
- Contingency_allowance subject Category:Process_management.
- Contingency_allowance comment "The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs.The concept was developed by Charles Bedaux.".
- Contingency_allowance label "Contingency allowance".
- Contingency_allowance label "Verteilzeit".
- Contingency_allowance sameAs Verteilzeit.
- Contingency_allowance sameAs m.0gfjl01.
- Contingency_allowance sameAs Q2518684.
- Contingency_allowance sameAs Q2518684.
- Contingency_allowance wasDerivedFrom Contingency_allowance?oldid=576956784.
- Contingency_allowance isPrimaryTopicOf Contingency_allowance.