Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Downtown_Seattle_Transit_Tunnel> ?p ?o. }
Showing items 1 to 86 of
86
with 100 items per page.
- Downtown_Seattle_Transit_Tunnel length "2.0921472".
- Downtown_Seattle_Transit_Tunnel abstract "The Downtown Seattle Transit Tunnel, also referred to as the Metro Bus Tunnel, is a 1.3-mile (2.1 km) public transit tunnel that runs the length of downtown Seattle, from 9th Avenue and Pike Street to 5th Avenue S. and S. Jackson Street. Approved by Metro Transit in 1983, construction began in 1987. It was completed and service began in 1990, at a total cost of $455 million. In May 2000, the King County Council transferred ownership to Sound Transit, but ownership was transferred back to King County Metro in 2002.The tunnel was closed on September 24, 2005 for modification to accommodate both buses and Sound Transit's Central Link light rail trains on a shared alignment. Prior to closure, around two dozen bus routes ran through the tunnel. The buses were dual-powered, operating as trolleybuses in the tunnel using electricity from overhead wires and as diesel buses on city streets. It reopened on Monday, September 24, 2007. The two-year closure included retrofits for light rail and other operating system upgrades. A stub tunnel, branching from the main tunnel, was constructed under Pine Street between 7th and Boren Avenues to allow light rail trains to stop and reverse direction and for future extension of Central Link.Due to the conversion to light rail, dual-mode trolleybuses can no longer operate in the tunnel. Those buses have already been replaced by Metro's current new fleet of hybrid buses, which produce fewer emissions than standard diesel buses, and, unlike the trolleybuses, require no connection to overhead wires.Since the floor of the tunnel was lowered for the light rail, bus mirrors are now at head height, and there have been concerns that they may strike passengers waiting on the platform. To prevent this, the mirror on the platform side of the bus are equipped with flashing lights and the speed limit in stations has been lowered from 15 to 10 mph (24 to 16 km/h).".
- Downtown_Seattle_Transit_Tunnel length "2092.1472".
- Downtown_Seattle_Transit_Tunnel location Downtown_Seattle.
- Downtown_Seattle_Transit_Tunnel numberOfStations "5".
- Downtown_Seattle_Transit_Tunnel openingDate "1990-09-15".
- Downtown_Seattle_Transit_Tunnel openingDate "2009-07-18".
- Downtown_Seattle_Transit_Tunnel openingYear "1990".
- Downtown_Seattle_Transit_Tunnel openingYear "2009".
- Downtown_Seattle_Transit_Tunnel operatedBy King_County_Metro.
- Downtown_Seattle_Transit_Tunnel operatedBy Sound_Transit.
- Downtown_Seattle_Transit_Tunnel railwayLineUsingTunnel Central_Link.
- Downtown_Seattle_Transit_Tunnel railwayLineUsingTunnel Sound_Transit_Express.
- Downtown_Seattle_Transit_Tunnel rebuildingDate "2005-09-24".
- Downtown_Seattle_Transit_Tunnel rebuildingYear "2005".
- Downtown_Seattle_Transit_Tunnel thumbnail Link_Tunell_Sound_transit.jpg?width=300.
- Downtown_Seattle_Transit_Tunnel wikiPageExternalLink metro.kingcounty.gov.
- Downtown_Seattle_Transit_Tunnel wikiPageExternalLink tunnel-stationart.html.
- Downtown_Seattle_Transit_Tunnel wikiPageExternalLink tunnel.html.
- Downtown_Seattle_Transit_Tunnel wikiPageExternalLink projects.soundtransit.org.
- Downtown_Seattle_Transit_Tunnel wikiPageExternalLink tunnel.html.
- Downtown_Seattle_Transit_Tunnel wikiPageExternalLink www.soundtransit.org.
- Downtown_Seattle_Transit_Tunnel wikiPageID "870173".
- Downtown_Seattle_Transit_Tunnel wikiPageRevisionID "604415119".
- Downtown_Seattle_Transit_Tunnel caption "The first Central Link Light Rail trains are test run in the tunnel".
- Downtown_Seattle_Transit_Tunnel end "5".
- Downtown_Seattle_Transit_Tunnel hasPhotoCollection Downtown_Seattle_Transit_Tunnel.
- Downtown_Seattle_Transit_Tunnel line "Central Link, Metro 41, 71, 72, 73, 74, 76, 77, 101, 102, 106, 150, 216, 218, 219, 255, 316, STE 550".
- Downtown_Seattle_Transit_Tunnel location Downtown_Seattle.
- Downtown_Seattle_Transit_Tunnel name "Downtown Seattle Transit Tunnel".
- Downtown_Seattle_Transit_Tunnel open "1990-09-15".
- Downtown_Seattle_Transit_Tunnel open "2009-07-18".
- Downtown_Seattle_Transit_Tunnel operator "King County Metro, Sound Transit".
- Downtown_Seattle_Transit_Tunnel owner "King County Metro Transit".
- Downtown_Seattle_Transit_Tunnel rebuilt "--09-24".
- Downtown_Seattle_Transit_Tunnel start "9".
- Downtown_Seattle_Transit_Tunnel startwork "1987-03-06".
- Downtown_Seattle_Transit_Tunnel stations "5".
- Downtown_Seattle_Transit_Tunnel system "King County Metro bus and Sound Transit Central Link light rail".
- Downtown_Seattle_Transit_Tunnel traffic "Bus, light rail".
- Downtown_Seattle_Transit_Tunnel subject Category:Bus_rapid_transit_in_Washington_(state).
- Downtown_Seattle_Transit_Tunnel subject Category:Busways.
- Downtown_Seattle_Transit_Tunnel subject Category:Link_Light_Rail.
- Downtown_Seattle_Transit_Tunnel subject Category:Railroad_tunnels_in_Seattle,_Washington.
- Downtown_Seattle_Transit_Tunnel subject Category:ST_Express.
- Downtown_Seattle_Transit_Tunnel subject Category:Tunnels_completed_in_1990.
- Downtown_Seattle_Transit_Tunnel subject Category:Underground_rapid_transit_in_the_United_States.
- Downtown_Seattle_Transit_Tunnel point "47.599 -122.328".
- Downtown_Seattle_Transit_Tunnel type Artifact100021939.
- Downtown_Seattle_Transit_Tunnel type Object100002684.
- Downtown_Seattle_Transit_Tunnel type Passage103895293.
- Downtown_Seattle_Transit_Tunnel type Passageway103895585.
- Downtown_Seattle_Transit_Tunnel type PhysicalEntity100001930.
- Downtown_Seattle_Transit_Tunnel type RailroadTunnel104048441.
- Downtown_Seattle_Transit_Tunnel type RailroadTunnelsInWashington(state).
- Downtown_Seattle_Transit_Tunnel type Tunnel104497962.
- Downtown_Seattle_Transit_Tunnel type TunnelsCompletedIn1990.
- Downtown_Seattle_Transit_Tunnel type Way104564698.
- Downtown_Seattle_Transit_Tunnel type Whole100003553.
- Downtown_Seattle_Transit_Tunnel type YagoGeoEntity.
- Downtown_Seattle_Transit_Tunnel type YagoPermanentlyLocatedEntity.
- Downtown_Seattle_Transit_Tunnel type ArchitecturalStructure.
- Downtown_Seattle_Transit_Tunnel type Infrastructure.
- Downtown_Seattle_Transit_Tunnel type Place.
- Downtown_Seattle_Transit_Tunnel type RailwayTunnel.
- Downtown_Seattle_Transit_Tunnel type RouteOfTransportation.
- Downtown_Seattle_Transit_Tunnel type Wikidata:Q532.
- Downtown_Seattle_Transit_Tunnel type Place.
- Downtown_Seattle_Transit_Tunnel type Location.
- Downtown_Seattle_Transit_Tunnel type _Feature.
- Downtown_Seattle_Transit_Tunnel type SpatialThing.
- Downtown_Seattle_Transit_Tunnel comment "The Downtown Seattle Transit Tunnel, also referred to as the Metro Bus Tunnel, is a 1.3-mile (2.1 km) public transit tunnel that runs the length of downtown Seattle, from 9th Avenue and Pike Street to 5th Avenue S. and S. Jackson Street. Approved by Metro Transit in 1983, construction began in 1987. It was completed and service began in 1990, at a total cost of $455 million.".
- Downtown_Seattle_Transit_Tunnel label "Downtown Seattle Transit Tunnel".
- Downtown_Seattle_Transit_Tunnel label "Downtown Seattle Transit Tunnel".
- Downtown_Seattle_Transit_Tunnel label "西雅圖市中心公交隧道".
- Downtown_Seattle_Transit_Tunnel sameAs Downtown_Seattle_Transit_Tunnel.
- Downtown_Seattle_Transit_Tunnel sameAs m.03k65q.
- Downtown_Seattle_Transit_Tunnel sameAs Q3714809.
- Downtown_Seattle_Transit_Tunnel sameAs Q3714809.
- Downtown_Seattle_Transit_Tunnel sameAs Downtown_Seattle_Transit_Tunnel.
- Downtown_Seattle_Transit_Tunnel lat "47.599".
- Downtown_Seattle_Transit_Tunnel long "-122.328".
- Downtown_Seattle_Transit_Tunnel wasDerivedFrom Downtown_Seattle_Transit_Tunnel?oldid=604415119.
- Downtown_Seattle_Transit_Tunnel depiction Link_Tunell_Sound_transit.jpg.
- Downtown_Seattle_Transit_Tunnel isPrimaryTopicOf Downtown_Seattle_Transit_Tunnel.
- Downtown_Seattle_Transit_Tunnel name "Downtown Seattle Transit Tunnel".