Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Hambantota_Wind_Farm> ?p ?o. }
Showing items 1 to 75 of
75
with 100 items per page.
- Hambantota_Wind_Farm abstract "The Hambantota Wind Farm is the first wind farm to be commissioned in Sri Lanka. The farm is located along south-eastern coast of Hambantota, and consists of five NEG Micon M1500-600 wind turbines of 600 KW each. With a total installed capacity of 3 MW, the wind farm generates up to approximately 4,500 MWh of power annually.The wind farm stretches about 1,500 km2 (580 sq mi) in size, and cost approximately Rs.280 million (1999 rates), of which 34% were local funds and 66% were foreign funds. Foreign funds were raised by the Global Environmental Facility and the World Bank. Studies on the project dated as early as 1988, more than a decade before it was commissioned in 1999. The project is now owned by the Ceylon Electricity Board.".
- Hambantota_Wind_Farm averageAnnualGeneration "1.62E13".
- Hambantota_Wind_Farm capacityFactor "14.0".
- Hambantota_Wind_Farm country Sri_Lanka.
- Hambantota_Wind_Farm installedCapacity "3000000.0".
- Hambantota_Wind_Farm location Hambantota.
- Hambantota_Wind_Farm openingYear "1999".
- Hambantota_Wind_Farm owner Ceylon_Electricity_Board.
- Hambantota_Wind_Farm status "Operational".
- Hambantota_Wind_Farm thumbnail HambantotaWindFarm01.JPG?width=300.
- Hambantota_Wind_Farm wikiPageID "24455169".
- Hambantota_Wind_Farm wikiPageRevisionID "595152779".
- Hambantota_Wind_Farm asOf "2010-11-01".
- Hambantota_Wind_Farm averageAnnualGen "4500.0".
- Hambantota_Wind_Farm capacityFactor "14.0".
- Hambantota_Wind_Farm commissioned "March 1999".
- Hambantota_Wind_Farm coordinatesDisplay "inline,title".
- Hambantota_Wind_Farm coordinatesType "type:landmark_region:LK".
- Hambantota_Wind_Farm cost "Rs. 280 million".
- Hambantota_Wind_Farm country Sri_Lanka.
- Hambantota_Wind_Farm hasPhotoCollection Hambantota_Wind_Farm.
- Hambantota_Wind_Farm imageCaption "Two of the five turbines at the wind farm".
- Hambantota_Wind_Farm installedCapacity "3.0".
- Hambantota_Wind_Farm latD "6".
- Hambantota_Wind_Farm latM "8".
- Hambantota_Wind_Farm latNs "N".
- Hambantota_Wind_Farm latS "46".
- Hambantota_Wind_Farm locale Hambantota.
- Hambantota_Wind_Farm longD "81".
- Hambantota_Wind_Farm longEw "E".
- Hambantota_Wind_Farm longM "6".
- Hambantota_Wind_Farm longS "47".
- Hambantota_Wind_Farm name "Hambantota Wind Farm".
- Hambantota_Wind_Farm onshoreElevation "≈Sea level".
- Hambantota_Wind_Farm onshoreLandUse "Shrub lands".
- Hambantota_Wind_Farm owner Ceylon_Electricity_Board.
- Hambantota_Wind_Farm status "Operational".
- Hambantota_Wind_Farm turbineManu "NEG Micon".
- Hambantota_Wind_Farm turbineModel "M1500-600".
- Hambantota_Wind_Farm windFarmType "Onshore".
- Hambantota_Wind_Farm windTurbines "5".
- Hambantota_Wind_Farm subject Category:Buildings_and_structures_in_Southern_Province,_Sri_Lanka.
- Hambantota_Wind_Farm subject Category:Wind_farms_in_Sri_Lanka.
- Hambantota_Wind_Farm point "6.146111111111111 81.11305555555556".
- Hambantota_Wind_Farm type Artifact100021939.
- Hambantota_Wind_Farm type Facility103315023.
- Hambantota_Wind_Farm type Object100002684.
- Hambantota_Wind_Farm type PhysicalEntity100001930.
- Hambantota_Wind_Farm type PowerStation103996655.
- Hambantota_Wind_Farm type Station104306080.
- Hambantota_Wind_Farm type Whole100003553.
- Hambantota_Wind_Farm type WindFarm104586761.
- Hambantota_Wind_Farm type WindFarmsInSriLanka.
- Hambantota_Wind_Farm type YagoGeoEntity.
- Hambantota_Wind_Farm type YagoPermanentlyLocatedEntity.
- Hambantota_Wind_Farm type ArchitecturalStructure.
- Hambantota_Wind_Farm type Infrastructure.
- Hambantota_Wind_Farm type Place.
- Hambantota_Wind_Farm type PowerStation.
- Hambantota_Wind_Farm type Wikidata:Q532.
- Hambantota_Wind_Farm type Place.
- Hambantota_Wind_Farm type Location.
- Hambantota_Wind_Farm type _Feature.
- Hambantota_Wind_Farm comment "The Hambantota Wind Farm is the first wind farm to be commissioned in Sri Lanka. The farm is located along south-eastern coast of Hambantota, and consists of five NEG Micon M1500-600 wind turbines of 600 KW each. With a total installed capacity of 3 MW, the wind farm generates up to approximately 4,500 MWh of power annually.The wind farm stretches about 1,500 km2 (580 sq mi) in size, and cost approximately Rs.280 million (1999 rates), of which 34% were local funds and 66% were foreign funds.".
- Hambantota_Wind_Farm label "Hambantota Wind Farm".
- Hambantota_Wind_Farm sameAs m.080f6gs.
- Hambantota_Wind_Farm sameAs Q5644187.
- Hambantota_Wind_Farm sameAs Q5644187.
- Hambantota_Wind_Farm sameAs Hambantota_Wind_Farm.
- Hambantota_Wind_Farm lat "6.146111111111111".
- Hambantota_Wind_Farm long "81.11305555555556".
- Hambantota_Wind_Farm wasDerivedFrom Hambantota_Wind_Farm?oldid=595152779.
- Hambantota_Wind_Farm depiction HambantotaWindFarm01.JPG.
- Hambantota_Wind_Farm isPrimaryTopicOf Hambantota_Wind_Farm.
- Hambantota_Wind_Farm name "Hambantota Wind Farm".