- Kaligandaki_A_Hydroelectric_Power_Station abstract "Kaligandaki A Hydroelectric Power Station is situated at Mirmi of Syangja District about 300 km to the West of Kathmandu and 100 km from Pokhara in the same direction in Nepal. The Headworks is situated in Mirmi at the intersection of two perennial rivers, Andhikhola and Kaligandaki A whereas the power house is in Beltari(About 7 km towards the South-East of Mirmi). It is a run of river type of project and currently is the largest power plant of any kind in Nepal capable of generating 144 MWs of Electricity. Construction started in the year 1997 and was completed in the year 2002. It was constructed primarily to curb the ever increasing energy demand at that time and eliminate load-shedding prevalent due to the imbalance in demand and supply of energy. It was constructed with the financial aid of the Asian Development Bank with total costs reaching up to 50 billion NPR (Approx). These days it plays a pivotal role in balancing the power management system in Nepal.The project is a daily peaking type ROR project able to generate 144 MWs for full 24 hrs during the 3 months of Monsoon with the Generation dropping to about 70 Mega-Watts during the dry season. The Project however is equipped with Peaking pondage facility which enables it to generate 144 MWs for about 6 hrs even in the extreme dry season every day when demands are high (evenings). The Natural path of the river has been used for the pondage facility thus eliminating the need of a separate infrastructure for pondage.".
- Kaligandaki_A_Hydroelectric_Power_Station buildingStartYear "1997".
- Kaligandaki_A_Hydroelectric_Power_Station country Nepal.
- Kaligandaki_A_Hydroelectric_Power_Station description "Concrete gravity".
- Kaligandaki_A_Hydroelectric_Power_Station location Mirmi.
- Kaligandaki_A_Hydroelectric_Power_Station location Syangja.
- Kaligandaki_A_Hydroelectric_Power_Station openingYear "2002".
- Kaligandaki_A_Hydroelectric_Power_Station river Kaligandaki_River.
- Kaligandaki_A_Hydroelectric_Power_Station status "O".
- Kaligandaki_A_Hydroelectric_Power_Station thumbnail Kaligandaki_A_,_tailrace.jpg?width=300.
- Kaligandaki_A_Hydroelectric_Power_Station wikiPageID "18869780".
- Kaligandaki_A_Hydroelectric_Power_Station wikiPageRevisionID "601199123".
- Kaligandaki_A_Hydroelectric_Power_Station constructionBegan "1997".
- Kaligandaki_A_Hydroelectric_Power_Station coordinatesDisplay "inline,title".
- Kaligandaki_A_Hydroelectric_Power_Station coordinatesType "type:landmark".
- Kaligandaki_A_Hydroelectric_Power_Station cost "50000000000".
- Kaligandaki_A_Hydroelectric_Power_Station country Nepal.
- Kaligandaki_A_Hydroelectric_Power_Station damCrosses Kaligandaki_River.
- Kaligandaki_A_Hydroelectric_Power_Station damType "Concrete gravity".
- Kaligandaki_A_Hydroelectric_Power_Station extra "Consultant: Morrison Nudson International in Assoication with Norconsult International and I.V.O International Limited".
- Kaligandaki_A_Hydroelectric_Power_Station hasPhotoCollection Kaligandaki_A_Hydroelectric_Power_Station.
- Kaligandaki_A_Hydroelectric_Power_Station imageCaption "Tailrace of the project".
- Kaligandaki_A_Hydroelectric_Power_Station latD "27.976".
- Kaligandaki_A_Hydroelectric_Power_Station location Mirmi.
- Kaligandaki_A_Hydroelectric_Power_Station location Syangja.
- Kaligandaki_A_Hydroelectric_Power_Station locationMap "Nepal".
- Kaligandaki_A_Hydroelectric_Power_Station longD "83.568".
- Kaligandaki_A_Hydroelectric_Power_Station name "Kaligandaki A Hydroelectric Power Station".
- Kaligandaki_A_Hydroelectric_Power_Station opening "2002".
- Kaligandaki_A_Hydroelectric_Power_Station owner "Nepal Electricity Authority".
- Kaligandaki_A_Hydroelectric_Power_Station plantAnnualGen "860.0".
- Kaligandaki_A_Hydroelectric_Power_Station plantCapacity "144.0".
- Kaligandaki_A_Hydroelectric_Power_Station plantOperator "Nepal Electricity Authority".
- Kaligandaki_A_Hydroelectric_Power_Station plantTurbines "3".
- Kaligandaki_A_Hydroelectric_Power_Station plantType Run-of-the-river_hydroelectricity.
- Kaligandaki_A_Hydroelectric_Power_Station spillwayType "Radial gated".
- Kaligandaki_A_Hydroelectric_Power_Station status "O".
- Kaligandaki_A_Hydroelectric_Power_Station subject Category:Hydroelectric_power_stations_in_Nepal.
- Kaligandaki_A_Hydroelectric_Power_Station point "27.976 83.568".
- Kaligandaki_A_Hydroelectric_Power_Station type Artifact100021939.
- Kaligandaki_A_Hydroelectric_Power_Station type Barrier102796623.
- Kaligandaki_A_Hydroelectric_Power_Station type Dam103160309.
- Kaligandaki_A_Hydroelectric_Power_Station type Facility103315023.
- Kaligandaki_A_Hydroelectric_Power_Station type HydroelectricPowerStationsInNepal.
- Kaligandaki_A_Hydroelectric_Power_Station type Object100002684.
- Kaligandaki_A_Hydroelectric_Power_Station type Obstruction103839993.
- Kaligandaki_A_Hydroelectric_Power_Station type PhysicalEntity100001930.
- Kaligandaki_A_Hydroelectric_Power_Station type PowerStation103996655.
- Kaligandaki_A_Hydroelectric_Power_Station type Station104306080.
- Kaligandaki_A_Hydroelectric_Power_Station type Structure104341686.
- Kaligandaki_A_Hydroelectric_Power_Station type Whole100003553.
- Kaligandaki_A_Hydroelectric_Power_Station type YagoGeoEntity.
- Kaligandaki_A_Hydroelectric_Power_Station type YagoPermanentlyLocatedEntity.
- Kaligandaki_A_Hydroelectric_Power_Station type ArchitecturalStructure.
- Kaligandaki_A_Hydroelectric_Power_Station type Dam.
- Kaligandaki_A_Hydroelectric_Power_Station type Infrastructure.
- Kaligandaki_A_Hydroelectric_Power_Station type Place.
- Kaligandaki_A_Hydroelectric_Power_Station type Wikidata:Q532.
- Kaligandaki_A_Hydroelectric_Power_Station type Place.
- Kaligandaki_A_Hydroelectric_Power_Station type Location.
- Kaligandaki_A_Hydroelectric_Power_Station type _Feature.
- Kaligandaki_A_Hydroelectric_Power_Station comment "Kaligandaki A Hydroelectric Power Station is situated at Mirmi of Syangja District about 300 km to the West of Kathmandu and 100 km from Pokhara in the same direction in Nepal. The Headworks is situated in Mirmi at the intersection of two perennial rivers, Andhikhola and Kaligandaki A whereas the power house is in Beltari(About 7 km towards the South-East of Mirmi).".
- Kaligandaki_A_Hydroelectric_Power_Station label "Kaligandaki A Hydroelectric Power Station".
- Kaligandaki_A_Hydroelectric_Power_Station sameAs m.04gsq8v.
- Kaligandaki_A_Hydroelectric_Power_Station sameAs Q16893044.
- Kaligandaki_A_Hydroelectric_Power_Station sameAs Q16893044.
- Kaligandaki_A_Hydroelectric_Power_Station sameAs Kaligandaki_A_Hydroelectric_Power_Station.
- Kaligandaki_A_Hydroelectric_Power_Station lat "27.976".
- Kaligandaki_A_Hydroelectric_Power_Station long "83.568".
- Kaligandaki_A_Hydroelectric_Power_Station wasDerivedFrom Kaligandaki_A_Hydroelectric_Power_Station?oldid=601199123.
- Kaligandaki_A_Hydroelectric_Power_Station depiction Kaligandaki_A_,_tailrace.jpg.
- Kaligandaki_A_Hydroelectric_Power_Station isPrimaryTopicOf Kaligandaki_A_Hydroelectric_Power_Station.
- Kaligandaki_A_Hydroelectric_Power_Station name "Kaligandaki A Hydroelectric Power Station".