Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Line_1,_Chongqing_Rail_Transit> ?p ?o. }
Showing items 1 to 50 of
50
with 100 items per page.
- Line_1,_Chongqing_Rail_Transit abstract "Line 1 of Chongqing Rail Transit runs westwards from Chaotianmen to Daxuecheng. Line 1 begin operation on 28 July 2011.Line 1 runs 16.4 km from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.41 km. It is the city's first all-heavy rail subway line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction. In 1992, the Chongqing government had signed a Build-Operate-Transfer in 1992 with a Hong Kong company, and provided the land for the project, but work ceased in 1997 due to legal issues.[citation needed] Work resumed on the first stretch of the line (from Chaotianmen to Shapingba) on 9 June 2007, and opened to limited operation on July 28. An extension from Shapingba to Daxuecheng (University Town) began in 2009 and opened on December 21, 2012.Line 1 has 14 stations, including from east to west: Chaotianmen, Xiaoshizi, Jiaochangkou, Qixinggang, Lianglukou, Eling, Daping, Shiyoulu, Xietaizi, Shiqiaopu, Gaomiaocun, Majiayan, Xiaolongkan, and Shapingba stations. Lieshimu, Ciqikou, Shuangpingnan, Shuangpingbei, Laijiaqiao, Tuzhu, Huxi, Daxuecheng (University Town), and Jiandingpo stations are scheduled to open in 2013 once the Phase 2 extension of Line 1 is complete.Line 1 has transfer interchange stations with Line 2 at Jiaochangkou in Jeifangbei CBD and at Daping. Line 1 will have transfer station when Line 3 opens later in 2011 at Lianglukou, near the Chongqing Railway Station in the Caiyuanba section of central Yuzhong.".
- Line_1,_Chongqing_Rail_Transit isPartOf Chongqing_Rail_Transit.
- Line_1,_Chongqing_Rail_Transit lineLength "36600.0".
- Line_1,_Chongqing_Rail_Transit numberOfStations "23".
- Line_1,_Chongqing_Rail_Transit openingDate "2011-07-28".
- Line_1,_Chongqing_Rail_Transit openingYear "2011".
- Line_1,_Chongqing_Rail_Transit passengersPerDay "100000".
- Line_1,_Chongqing_Rail_Transit routeEnd Daxuecheng_Station_(Chongqing).
- Line_1,_Chongqing_Rail_Transit routeStart Chaotianmen_Station.
- Line_1,_Chongqing_Rail_Transit speedLimit "100.0".
- Line_1,_Chongqing_Rail_Transit thumbnail 重庆市轨道交通一号线较场口站.jpg?width=300.
- Line_1,_Chongqing_Rail_Transit type Rapid_transit.
- Line_1,_Chongqing_Rail_Transit wikiPageExternalLink 3373.htm.
- Line_1,_Chongqing_Rail_Transit wikiPageID "32569578".
- Line_1,_Chongqing_Rail_Transit wikiPageRevisionID "606735015".
- Line_1,_Chongqing_Rail_Transit end Daxuecheng_Station_(Chongqing).
- Line_1,_Chongqing_Rail_Transit hasPhotoCollection Line_1,_Chongqing_Rail_Transit.
- Line_1,_Chongqing_Rail_Transit imageWidth "265".
- Line_1,_Chongqing_Rail_Transit linelength "36.6".
- Line_1,_Chongqing_Rail_Transit map "250".
- Line_1,_Chongqing_Rail_Transit mapState "collapsed".
- Line_1,_Chongqing_Rail_Transit open "2011-07-28".
- Line_1,_Chongqing_Rail_Transit operator "Chongqing Rail Transit Corp., Ltd".
- Line_1,_Chongqing_Rail_Transit ridership "100000".
- Line_1,_Chongqing_Rail_Transit speed "100.0".
- Line_1,_Chongqing_Rail_Transit start Chaotianmen_Station.
- Line_1,_Chongqing_Rail_Transit stations "23".
- Line_1,_Chongqing_Rail_Transit system Chongqing_Rail_Transit.
- Line_1,_Chongqing_Rail_Transit type Rapid_transit.
- Line_1,_Chongqing_Rail_Transit subject Category:Chongqing_Rail_Transit.
- Line_1,_Chongqing_Rail_Transit subject Category:Railway_lines_opened_in_2011.
- Line_1,_Chongqing_Rail_Transit type ArchitecturalStructure.
- Line_1,_Chongqing_Rail_Transit type Infrastructure.
- Line_1,_Chongqing_Rail_Transit type Place.
- Line_1,_Chongqing_Rail_Transit type RailwayLine.
- Line_1,_Chongqing_Rail_Transit type RouteOfTransportation.
- Line_1,_Chongqing_Rail_Transit type Wikidata:Q532.
- Line_1,_Chongqing_Rail_Transit type Place.
- Line_1,_Chongqing_Rail_Transit type Location.
- Line_1,_Chongqing_Rail_Transit comment "Line 1 of Chongqing Rail Transit runs westwards from Chaotianmen to Daxuecheng. Line 1 begin operation on 28 July 2011.Line 1 runs 16.4 km from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.41 km. It is the city's first all-heavy rail subway line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction.".
- Line_1,_Chongqing_Rail_Transit label "Line 1, Chongqing Rail Transit".
- Line_1,_Chongqing_Rail_Transit label "重庆轨道交通1号线".
- Line_1,_Chongqing_Rail_Transit label "重慶軌道交通1号線".
- Line_1,_Chongqing_Rail_Transit sameAs 重慶軌道交通1号線.
- Line_1,_Chongqing_Rail_Transit sameAs m.0h1c6dg.
- Line_1,_Chongqing_Rail_Transit sameAs Q263572.
- Line_1,_Chongqing_Rail_Transit sameAs Q263572.
- Line_1,_Chongqing_Rail_Transit wasDerivedFrom Line_1,_Chongqing_Rail_Transit?oldid=606735015.
- Line_1,_Chongqing_Rail_Transit depiction 重庆市轨道交通一号线较场口站.jpg.
- Line_1,_Chongqing_Rail_Transit isPrimaryTopicOf Line_1,_Chongqing_Rail_Transit.