- MIDAL abstract "MIDAL (Mitte-Deutschland-Anbindungsleitung) is a 702 kilometres (436 mi) long German natural gas pipeline, which connects the North Sea with southern Germany. It runs from Bunde, where it is connected with Netherlands gas system, and Emdel receiving terminal, to Ludwigshafen. The pipeline has a capacity of 12.8 billion cubic mters of natural gas per year. It was constructed in 1992-1993, and it is owned and operated by Wingas GmbH & Co. KG.The northern section of the pipeline which runs from Bunde and Rysum to Rehden is 175 kilometres (109 mi) long and has a diameter of 900 millimetres (35 in). In Rehden, the pipeline is connected with the Rehden gas storage. Also the Rehden–Hamburg gas pipeline branches-off from MIDAL. In future, MIDAL will be connected with the NEL pipeline at Reheden.The middle section with length of 175 kilometres (109 mi) connects Rehden with Reckrod. This section has a diameter of 1,000 millimetres (39 in). In Bad Salzuflen, the WEDAL pipeline towards Belgium branches-off from MIDAL. In Reckrod, MIDAL is connected with the STEGAL pipeline.The 210 kilometres (130 mi) long southern section with a diameter of 800 millimetres (31 in) runs from Reckrod to Ludwigshafen. In Ludwigshafen, the pipeline is connected with a 57 kilometres (35 mi) long MIDAL-ERM branch-off pipeline to Jockgrim. It has a diameter of 400 millimetres (16 in). MIDAL-ERM was commissioned in April 1964.".
- MIDAL wikiPageExternalLink midal.html?&L=1.
- MIDAL wikiPageID "7504001".
- MIDAL wikiPageRevisionID "603295618".
- MIDAL compressorStations Bunde,_Germany.
- MIDAL compressorStations Lippe.
- MIDAL compressorStations "Reckrod".
- MIDAL compressorStationsNo "3".
- MIDAL construction "1992".
- MIDAL country Germany.
- MIDAL diameterMm "1000".
- MIDAL direction "north–south".
- MIDAL discharge "12800000000".
- MIDAL est "1993".
- MIDAL finish Ludwigshafen.
- MIDAL hasPhotoCollection MIDAL.
- MIDAL lengthKm "702".
- MIDAL mapCaption "Location of MIDAL".
- MIDAL name "MIDAL".
- MIDAL operator "Gascade Gastransport GmbH".
- MIDAL start Bunde,_Germany.
- MIDAL through Bad_Salzuflen.
- MIDAL through Rehden.
- MIDAL through "Reckrod".
- MIDAL type Natural_gas.
- MIDAL subject Category:Buildings_and_structures_completed_in_1993.
- MIDAL subject Category:Natural_gas_pipelines_in_Germany.
- MIDAL type Abstraction100002137.
- MIDAL type Act100030358.
- MIDAL type Event100029378.
- MIDAL type Gossip107223170.
- MIDAL type Grapevine107223635.
- MIDAL type Informing107212190.
- MIDAL type NaturalGasPipelinesInEurope.
- MIDAL type PipelinesInGermany.
- MIDAL type PsychologicalFeature100023100.
- MIDAL type Report107217924.
- MIDAL type SpeechAct107160883.
- MIDAL type YagoPermanentlyLocatedEntity.
- MIDAL comment "MIDAL (Mitte-Deutschland-Anbindungsleitung) is a 702 kilometres (436 mi) long German natural gas pipeline, which connects the North Sea with southern Germany. It runs from Bunde, where it is connected with Netherlands gas system, and Emdel receiving terminal, to Ludwigshafen. The pipeline has a capacity of 12.8 billion cubic mters of natural gas per year. It was constructed in 1992-1993, and it is owned and operated by Wingas GmbH & Co.".
- MIDAL label "MIDAL".
- MIDAL label "MIDAL".
- MIDAL sameAs MIDAL.
- MIDAL sameAs m.0263p_s.
- MIDAL sameAs Q1564220.
- MIDAL sameAs Q1564220.
- MIDAL sameAs MIDAL.
- MIDAL wasDerivedFrom MIDAL?oldid=603295618.
- MIDAL isPrimaryTopicOf MIDAL.