Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Nangbeto_Dam> ?p ?o. }
Showing items 1 to 57 of
57
with 100 items per page.
- Nangbeto_Dam length "0.443".
- Nangbeto_Dam abstract "The Nangbeto Dam is a an embankment dam on the Mono River in the Plateaux Region of Togo. It was constructed between 1984 and 1987 for the purpose of providing hydroelectric power to both Togo and Benin as well as creating fisheries and supplying water for irrigation. The dam's 65.6 MW power station was commissioned in June 1987. The project was financed by the World Bank and African Development Bank at a cost of US$98.22 million.".
- Nangbeto_Dam buildingStartYear "1984".
- Nangbeto_Dam country Togo.
- Nangbeto_Dam height "52.0".
- Nangbeto_Dam length "443.0".
- Nangbeto_Dam location Plateaux_Region,_Togo.
- Nangbeto_Dam openingYear "1987".
- Nangbeto_Dam purpose "Power, irrigation, fisheries".
- Nangbeto_Dam status "O".
- Nangbeto_Dam wikiPageID "42306437".
- Nangbeto_Dam wikiPageRevisionID "601221098".
- Nangbeto_Dam constructionBegan "1984".
- Nangbeto_Dam coordinatesDisplay "inline,title".
- Nangbeto_Dam coordinatesType "type:landmark".
- Nangbeto_Dam cost "US$98.22 million".
- Nangbeto_Dam country Togo.
- Nangbeto_Dam latD "7".
- Nangbeto_Dam latM "25".
- Nangbeto_Dam latNs "N".
- Nangbeto_Dam latS "25.4".
- Nangbeto_Dam location Plateaux_Region,_Togo.
- Nangbeto_Dam locationMap "Togo".
- Nangbeto_Dam longD "1".
- Nangbeto_Dam longEw "E".
- Nangbeto_Dam longM "26".
- Nangbeto_Dam longS "5.82".
- Nangbeto_Dam name "Nangbeto Dam".
- Nangbeto_Dam plantCapacity "65.6".
- Nangbeto_Dam plantCommission "1987".
- Nangbeto_Dam plantTurbines "2".
- Nangbeto_Dam purpose "Power, irrigation, fisheries".
- Nangbeto_Dam status "O".
- Nangbeto_Dam subject Category:Dams_completed_in_1987.
- Nangbeto_Dam subject Category:Dams_in_Togo.
- Nangbeto_Dam subject Category:Energy_infrastructure_completed_in_1987.
- Nangbeto_Dam subject Category:Hydroelectric_power_stations_in_Togo.
- Nangbeto_Dam subject Category:Plateaux_Region,_Togo.
- Nangbeto_Dam point "7.4237222222222226 1.43495".
- Nangbeto_Dam type ArchitecturalStructure.
- Nangbeto_Dam type Dam.
- Nangbeto_Dam type Infrastructure.
- Nangbeto_Dam type Place.
- Nangbeto_Dam type Wikidata:Q532.
- Nangbeto_Dam type Place.
- Nangbeto_Dam type Location.
- Nangbeto_Dam type _Feature.
- Nangbeto_Dam comment "The Nangbeto Dam is a an embankment dam on the Mono River in the Plateaux Region of Togo. It was constructed between 1984 and 1987 for the purpose of providing hydroelectric power to both Togo and Benin as well as creating fisheries and supplying water for irrigation. The dam's 65.6 MW power station was commissioned in June 1987. The project was financed by the World Bank and African Development Bank at a cost of US$98.22 million.".
- Nangbeto_Dam label "Nangbeto Dam".
- Nangbeto_Dam sameAs m.01029hsc.
- Nangbeto_Dam sameAs Q16895657.
- Nangbeto_Dam sameAs Q16895657.
- Nangbeto_Dam lat "7.4237222222222226".
- Nangbeto_Dam long "1.43495".
- Nangbeto_Dam wasDerivedFrom Nangbeto_Dam?oldid=601221098.
- Nangbeto_Dam isPrimaryTopicOf Nangbeto_Dam.
- Nangbeto_Dam name "Nangbeto Dam".