- Network_Rail_Control_Periods abstract "Network Rail Control Periods are the 5-year timespans into which Network Rail, the owner and operator of most of the rail infrastructure in Great Britain, works for financial and other planning purposes. Each Control Period begins on 1 April and ends on 31 March to coincide with the financial year. These periods were inherited from Railtrack, so that the earlier ones are retrospective, and not necessarily of 5 years duration.As Network Rail is responsible for developing and maintaining railway infrastructure, the Control Periods are used to decide priorities for investment. Infrastructure developments have taken place or are planned as follows:".
- Network_Rail_Control_Periods wikiPageExternalLink IIP.aspx.
- Network_Rail_Control_Periods wikiPageExternalLink 12070.aspx.
- Network_Rail_Control_Periods wikiPageExternalLink control-period-5.
- Network_Rail_Control_Periods wikiPageID "36668842".
- Network_Rail_Control_Periods wikiPageRevisionID "582521344".
- Network_Rail_Control_Periods hasPhotoCollection Network_Rail_Control_Periods.
- Network_Rail_Control_Periods subject Category:Network_Rail.
- Network_Rail_Control_Periods comment "Network Rail Control Periods are the 5-year timespans into which Network Rail, the owner and operator of most of the rail infrastructure in Great Britain, works for financial and other planning purposes. Each Control Period begins on 1 April and ends on 31 March to coincide with the financial year.".
- Network_Rail_Control_Periods label "Network Rail Control Periods".
- Network_Rail_Control_Periods sameAs m.0kvhnqn.
- Network_Rail_Control_Periods sameAs Q16998665.
- Network_Rail_Control_Periods sameAs Q16998665.
- Network_Rail_Control_Periods wasDerivedFrom Network_Rail_Control_Periods?oldid=582521344.
- Network_Rail_Control_Periods isPrimaryTopicOf Network_Rail_Control_Periods.