Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Ruby_Pipeline> ?p ?o. }
Showing items 1 to 47 of
47
with 100 items per page.
- Ruby_Pipeline abstract "The Ruby Pipeline is a 42-inch (1,100 mm) natural gas pipeline running from Opal, Wyoming, to Malin, Oregon. The route crosses Northern Utah, and Northern Nevada. Ruby Pipeline, L.L.C. filed an application with the Federal Energy Regulatory Commission (FERC) on January 27, 2009, authorizing the construction and operation of the Ruby Pipeline Project. On April 5, 2010, the FERC approved the application. Construction began on July 31, 2010, and the pipeline was placed in service on July 28, 2011. The pipe is 680 miles (1,090 km) long with an expected capacity of 1.5 billion cubic feet per day (42×10^6 m3/d).".
- Ruby_Pipeline wikiPageExternalLink ruby_pipeline_project.html.
- Ruby_Pipeline wikiPageID "28489729".
- Ruby_Pipeline wikiPageRevisionID "565564083".
- Ruby_Pipeline country United_States.
- Ruby_Pipeline diameterIn "42".
- Ruby_Pipeline direction "east-west".
- Ruby_Pipeline discharge "1500000000".
- Ruby_Pipeline est "2010".
- Ruby_Pipeline finish Malin,_Oregon.
- Ruby_Pipeline hasPhotoCollection Ruby_Pipeline.
- Ruby_Pipeline lengthMi "680".
- Ruby_Pipeline mapCaption "Location of Ruby Pipeline".
- Ruby_Pipeline name "Ruby Pipeline".
- Ruby_Pipeline operator "Ruby Pipeline, L.L.C.".
- Ruby_Pipeline partners El_Paso_Corp..
- Ruby_Pipeline start Opal,_Wyoming.
- Ruby_Pipeline through Nevada.
- Ruby_Pipeline through Oregon.
- Ruby_Pipeline through Utah.
- Ruby_Pipeline through Wyoming.
- Ruby_Pipeline type "natural gas".
- Ruby_Pipeline subject Category:Energy_infrastructure_completed_in_2010.
- Ruby_Pipeline subject Category:Energy_resource_facilities_in_Nevada.
- Ruby_Pipeline subject Category:Energy_resource_facilities_in_Oregon.
- Ruby_Pipeline subject Category:Energy_resource_facilities_in_Utah.
- Ruby_Pipeline subject Category:Energy_resource_facilities_in_Wyoming.
- Ruby_Pipeline subject Category:Natural_gas_pipelines_in_the_United_States.
- Ruby_Pipeline type Abstraction100002137.
- Ruby_Pipeline type Act100030358.
- Ruby_Pipeline type Event100029378.
- Ruby_Pipeline type Gossip107223170.
- Ruby_Pipeline type Grapevine107223635.
- Ruby_Pipeline type Informing107212190.
- Ruby_Pipeline type NaturalGasPipelinesInTheUnitedStates.
- Ruby_Pipeline type PsychologicalFeature100023100.
- Ruby_Pipeline type Report107217924.
- Ruby_Pipeline type SpeechAct107160883.
- Ruby_Pipeline type YagoPermanentlyLocatedEntity.
- Ruby_Pipeline comment "The Ruby Pipeline is a 42-inch (1,100 mm) natural gas pipeline running from Opal, Wyoming, to Malin, Oregon. The route crosses Northern Utah, and Northern Nevada. Ruby Pipeline, L.L.C. filed an application with the Federal Energy Regulatory Commission (FERC) on January 27, 2009, authorizing the construction and operation of the Ruby Pipeline Project. On April 5, 2010, the FERC approved the application.".
- Ruby_Pipeline label "Ruby Pipeline".
- Ruby_Pipeline sameAs m.0crfgm7.
- Ruby_Pipeline sameAs Q7376368.
- Ruby_Pipeline sameAs Q7376368.
- Ruby_Pipeline sameAs Ruby_Pipeline.
- Ruby_Pipeline wasDerivedFrom Ruby_Pipeline?oldid=565564083.
- Ruby_Pipeline isPrimaryTopicOf Ruby_Pipeline.