Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Tehachapi_Renewable_Transmission_Project> ?p ?o. }
Showing items 1 to 33 of
33
with 100 items per page.
- Tehachapi_Renewable_Transmission_Project abstract "The Tehachapi Renewable Transmission Project is a project to build approximately 173 miles of new and upgraded high-voltage transmission lines for transmission of electricity from wind farms and other generating units in southern Kern county, California to Los Angeles County and the existing Mira Loma Substation in San Bernardino County. The project is developed by Southern California Edison. Construction started on March 7, 2008. When completed in 2013, the transmission system will have a capacity of 4,500 megawatts that could provide power for 3 million homes.State laws requiring SCE to provide at least 33% of its power service from renewable sources by 2020 is driving the project. The SCE has no interest in owning the land that the project is on, but is obligated to construct the transmission system nonetheless.".
- Tehachapi_Renewable_Transmission_Project wikiPageExternalLink TRTP.htm.
- Tehachapi_Renewable_Transmission_Project wikiPageExternalLink Wind.
- Tehachapi_Renewable_Transmission_Project wikiPageID "19516244".
- Tehachapi_Renewable_Transmission_Project wikiPageRevisionID "545453308".
- Tehachapi_Renewable_Transmission_Project hasPhotoCollection Tehachapi_Renewable_Transmission_Project.
- Tehachapi_Renewable_Transmission_Project subject Category:Electric_power_transmission_systems_in_the_United_States.
- Tehachapi_Renewable_Transmission_Project subject Category:Energy_resource_facilities_in_California.
- Tehachapi_Renewable_Transmission_Project subject Category:Proposed_electric_power_transmission_systems.
- Tehachapi_Renewable_Transmission_Project subject Category:Tehachapi_Mountains.
- Tehachapi_Renewable_Transmission_Project type Artifact100021939.
- Tehachapi_Renewable_Transmission_Project type EnergyResourceFacilitiesInCalifornia.
- Tehachapi_Renewable_Transmission_Project type Facility103315023.
- Tehachapi_Renewable_Transmission_Project type GeologicalFormation109287968.
- Tehachapi_Renewable_Transmission_Project type Mountain109359803.
- Tehachapi_Renewable_Transmission_Project type NaturalElevation109366317.
- Tehachapi_Renewable_Transmission_Project type Object100002684.
- Tehachapi_Renewable_Transmission_Project type PhysicalEntity100001930.
- Tehachapi_Renewable_Transmission_Project type TehachapiMountains.
- Tehachapi_Renewable_Transmission_Project type Whole100003553.
- Tehachapi_Renewable_Transmission_Project type YagoGeoEntity.
- Tehachapi_Renewable_Transmission_Project type YagoPermanentlyLocatedEntity.
- Tehachapi_Renewable_Transmission_Project comment "The Tehachapi Renewable Transmission Project is a project to build approximately 173 miles of new and upgraded high-voltage transmission lines for transmission of electricity from wind farms and other generating units in southern Kern county, California to Los Angeles County and the existing Mira Loma Substation in San Bernardino County. The project is developed by Southern California Edison. Construction started on March 7, 2008.".
- Tehachapi_Renewable_Transmission_Project label "Projet de transmission de l'énergie renouvelable de Tehachapi".
- Tehachapi_Renewable_Transmission_Project label "Tehachapi Renewable Transmission Project".
- Tehachapi_Renewable_Transmission_Project sameAs Projet_de_transmission_de_l'énergie_renouvelable_de_Tehachapi.
- Tehachapi_Renewable_Transmission_Project sameAs m.04n4spn.
- Tehachapi_Renewable_Transmission_Project sameAs Q3407278.
- Tehachapi_Renewable_Transmission_Project sameAs Q3407278.
- Tehachapi_Renewable_Transmission_Project sameAs Tehachapi_Renewable_Transmission_Project.
- Tehachapi_Renewable_Transmission_Project wasDerivedFrom Tehachapi_Renewable_Transmission_Project?oldid=545453308.
- Tehachapi_Renewable_Transmission_Project homepage Wind.
- Tehachapi_Renewable_Transmission_Project isPrimaryTopicOf Tehachapi_Renewable_Transmission_Project.