Matches in DBpedia 2014 for { <http://dbpedia.org/resource/Tehran_Bus_Rapid_Transit> ?p ?o. }
Showing items 1 to 17 of
17
with 100 items per page.
- Tehran_Bus_Rapid_Transit abstract "Tehran Bus Rapid Transit was officially inaugurated in 2008 in order to facilitate the motor traffic in Tehran. As at 2011 the bus rapid transit (BRT) system had a network of 100 kilometers which transports 1.8 million passengers on a daily basis.Tehran has 6 BRT lines.1- Line 1: Azadi Sq. to Tehranpars (Jan. 2008)2- Line 2: Azadi Terminal to Khavaran Terminal3- Line 3: Elm-O-Sanat Terminal to Khavaran Terminal (Feb. 2009)4- Line 4: Tehran South Terminal to Chamran Highway-Parkway Intersection5- Line 7: Railway station that is located in southern part of Tehran to Tajrish that is located in northern part of Tehran. 6- Line 10: Azadi Sq. to Daneshgah Azad sq. in HesarakThe total length of BRT in Tehran is about 150 km that will be increased to 300 km in future.Tehran's mayor, Dr. Ghalibaf addressed the inaugural ceremony saying: Polls conducted in recent years have shown that one of the most important concerns of Tehran citizens is motor traffic and related problems because it causes health problems, increases economic costs and leads to countless hours of wasted time. Therefore, the Tehran Municipality and the Islamic City Council cannot be indifferent to challenges related to this issue.".
- Tehran_Bus_Rapid_Transit thumbnail TehranBRT.png?width=300.
- Tehran_Bus_Rapid_Transit wikiPageID "20641271".
- Tehran_Bus_Rapid_Transit wikiPageRevisionID "575921761".
- Tehran_Bus_Rapid_Transit hasPhotoCollection Tehran_Bus_Rapid_Transit.
- Tehran_Bus_Rapid_Transit subject Category:2008_establishments_in_Iran.
- Tehran_Bus_Rapid_Transit subject Category:Bus_rapid_transit.
- Tehran_Bus_Rapid_Transit subject Category:Bus_transport_in_Iran.
- Tehran_Bus_Rapid_Transit subject Category:Transport_in_Tehran.
- Tehran_Bus_Rapid_Transit comment "Tehran Bus Rapid Transit was officially inaugurated in 2008 in order to facilitate the motor traffic in Tehran. As at 2011 the bus rapid transit (BRT) system had a network of 100 kilometers which transports 1.8 million passengers on a daily basis.Tehran has 6 BRT lines.1- Line 1: Azadi Sq. to Tehranpars (Jan. 2008)2- Line 2: Azadi Terminal to Khavaran Terminal3- Line 3: Elm-O-Sanat Terminal to Khavaran Terminal (Feb.".
- Tehran_Bus_Rapid_Transit label "Tehran Bus Rapid Transit".
- Tehran_Bus_Rapid_Transit sameAs m.0520_hc.
- Tehran_Bus_Rapid_Transit sameAs Q7694880.
- Tehran_Bus_Rapid_Transit sameAs Q7694880.
- Tehran_Bus_Rapid_Transit wasDerivedFrom Tehran_Bus_Rapid_Transit?oldid=575921761.
- Tehran_Bus_Rapid_Transit depiction TehranBRT.png.
- Tehran_Bus_Rapid_Transit isPrimaryTopicOf Tehran_Bus_Rapid_Transit.