Matches in Library of Congress for { <http://lccn.loc.gov/2005034725> ?p ?o. }
Showing items 1 to 24 of
24
with 100 items per page.
- 2005034725 alternative "Lean manufacturing advisor.".
- 2005034725 contributor B10145878.
- 2005034725 created "2006.".
- 2005034725 date "2006".
- 2005034725 date "2006.".
- 2005034725 dateCopyrighted "2006.".
- 2005034725 description "De-coupling and coupling : keys to better cell design -- Cell staffing options (by Vulcan Electric) -- Job shop breaks traditional rules with 1-piece flow cells -- Cells on wheels give company ability to shift course quickly -- Takt time can configure a cell -- You may need two takt times -- Reducing scrap paves the way for a big boost in capacity -- Building out of sequence is expensive -- Ford sees its future in flexibility -- Building a better body shop -- Heijunka can help eliminate production peaks and valleys -- Work speeds up as operators move -- Times, not products, set schedule -- 12-hour shifts help tire plant achieve its lean objectives -- What is in your changeover? : probably more than you need -- SMED doubles parts output for metal stamping company -- Calculating changeover costs reveals potential for savings -- Sequencing products leads to least changeover time -- Success with cardboard & duct tape -- Time to take a radical step forward -- Equipment designed through 3P makes a small startup viable citations.".
- 2005034725 description "Includes bibliographical references (p 133-134) and index.".
- 2005034725 extent "viii, 143 p. :".
- 2005034725 identifier "1563273322 (alk. paper)".
- 2005034725 identifier 2005034725-d.html.
- 2005034725 identifier 2005034725.html.
- 2005034725 issued "2006".
- 2005034725 issued "2006.".
- 2005034725 language "eng".
- 2005034725 publisher "New York : Productivity Press,".
- 2005034725 subject "658.5/03 22".
- 2005034725 subject "Business logistics Case studies.".
- 2005034725 subject "HD38.5 .I56 2006".
- 2005034725 subject "Industrial efficiency Case studies.".
- 2005034725 subject "Industrial management Case studies.".
- 2005034725 tableOfContents "De-coupling and coupling : keys to better cell design -- Cell staffing options (by Vulcan Electric) -- Job shop breaks traditional rules with 1-piece flow cells -- Cells on wheels give company ability to shift course quickly -- Takt time can configure a cell -- You may need two takt times -- Reducing scrap paves the way for a big boost in capacity -- Building out of sequence is expensive -- Ford sees its future in flexibility -- Building a better body shop -- Heijunka can help eliminate production peaks and valleys -- Work speeds up as operators move -- Times, not products, set schedule -- 12-hour shifts help tire plant achieve its lean objectives -- What is in your changeover? : probably more than you need -- SMED doubles parts output for metal stamping company -- Calculating changeover costs reveals potential for savings -- Sequencing products leads to least changeover time -- Success with cardboard & duct tape -- Time to take a radical step forward -- Equipment designed through 3P makes a small startup viable citations.".
- 2005034725 title "Insights on implementation--improving flow : collected practices and cases.".
- 2005034725 type "text".