Matches in Library of Congress for { <http://lccn.loc.gov/2008041829> ?p ?o. }
Showing items 1 to 21 of
21
with 100 items per page.
- 2008041829 contributor B11121427.
- 2008041829 contributor B11121428.
- 2008041829 created "c2009.".
- 2008041829 date "2009".
- 2008041829 date "c2009.".
- 2008041829 dateCopyrighted "c2009.".
- 2008041829 description "Includes bibliographical references and indexes.".
- 2008041829 description "Introduction -- Single-machine sequencing -- Optimization methods for the single-machine problem -- Heuristic methods for the single-machine problem -- Earliness and tardiness costs -- Sequencing for stochastic scheduling -- Safe scheduling -- Extensions of the basic model -- Parallel-machine models -- Flow shop scheduling -- Stochastic flow shop scheduling -- Lot streaming procedures for the flow shop -- Scheduling groups of jobs -- The job shop problem -- Simulation models for the dynamic job shop -- Network methods for project scheduling -- Resource-constrained project scheduling -- Safe scheduling for projects -- Appendix A: Practical processing time distributions -- Appendix B: The critical ratio rule -- Appendix C: Integer programming models for sequencing.".
- 2008041829 extent "xv, 493 p. :".
- 2008041829 identifier "0470391650 (cloth)".
- 2008041829 identifier "9780470391655 (cloth)".
- 2008041829 issued "2009".
- 2008041829 issued "c2009.".
- 2008041829 language "eng".
- 2008041829 publisher "Hoboken, N.J. : John Wiley,".
- 2008041829 subject "658.5/3 22".
- 2008041829 subject "Production scheduling.".
- 2008041829 subject "TS157.5 .B35 2009".
- 2008041829 tableOfContents "Introduction -- Single-machine sequencing -- Optimization methods for the single-machine problem -- Heuristic methods for the single-machine problem -- Earliness and tardiness costs -- Sequencing for stochastic scheduling -- Safe scheduling -- Extensions of the basic model -- Parallel-machine models -- Flow shop scheduling -- Stochastic flow shop scheduling -- Lot streaming procedures for the flow shop -- Scheduling groups of jobs -- The job shop problem -- Simulation models for the dynamic job shop -- Network methods for project scheduling -- Resource-constrained project scheduling -- Safe scheduling for projects -- Appendix A: Practical processing time distributions -- Appendix B: The critical ratio rule -- Appendix C: Integer programming models for sequencing.".
- 2008041829 title "Principles of sequencing and scheduling / Kenneth R. Baker, Dan Trietsch.".
- 2008041829 type "text".