Matches in Library of Congress for { <http://lccn.loc.gov/2008377907> ?p ?o. }
Showing items 1 to 31 of
31
with 100 items per page.
- 2008377907 abstract "Reconstruction of bridge approach slabs which have failed due to a loss of support from embankment fill consolidation or erosion can be particularly challenging in urban areas where lane closures must be minimized. Precast prestressed concrete pavement is a potential solution for rapid bridge approach slab reconstruction which uses prefabricated pavement panels that can be installed and opened to traffic quickly. To evaluate this solution, the Iowa Department of Transportation constructed a precast prestressed approach slab demonstration project on Highway 60 near Sheldon, Iowa in August/September 2006. Two approach slabs at either end of a new bridge were constructed using precast prestressed concrete panels. This report documents the successful development, design, and construction of the precast prestressed concrete bridge approach slabs on Highway 60. The report discusses the challenges and issues that were faced during the project and presents recommendations for future implementation of this innovative construction technique.".
- 2008377907 contributor B11225664.
- 2008377907 contributor B11225665.
- 2008377907 contributor B11225666.
- 2008377907 coverage "Iowa Highway 60.".
- 2008377907 created "2007.".
- 2008377907 date "2007".
- 2008377907 date "2007.".
- 2008377907 dateCopyrighted "2007.".
- 2008377907 description "Final report.".
- 2008377907 description "Includes bibliographical references (p. 65-66).".
- 2008377907 description "Reconstruction of bridge approach slabs which have failed due to a loss of support from embankment fill consolidation or erosion can be particularly challenging in urban areas where lane closures must be minimized. Precast prestressed concrete pavement is a potential solution for rapid bridge approach slab reconstruction which uses prefabricated pavement panels that can be installed and opened to traffic quickly. To evaluate this solution, the Iowa Department of Transportation constructed a precast prestressed approach slab demonstration project on Highway 60 near Sheldon, Iowa in August/September 2006. Two approach slabs at either end of a new bridge were constructed using precast prestressed concrete panels. This report documents the successful development, design, and construction of the precast prestressed concrete bridge approach slabs on Highway 60. The report discusses the challenges and issues that were faced during the project and presents recommendations for future implementation of this innovative construction technique.".
- 2008377907 description "Sponsored by the Iowa Highway Research Board, Iowa Dept. of Transportation and the U.S. Federal Highway Administration IHRB project HR-1085".
- 2008377907 extent "98 p. :".
- 2008377907 hasFormat "Also available via the internet.".
- 2008377907 identifier hr1085.pdf.
- 2008377907 isFormatOf "Also available via the internet.".
- 2008377907 issued "2007".
- 2008377907 issued "2007.".
- 2008377907 language "eng".
- 2008377907 publisher "Ames, Iowa : Iowa Highway Research Board,".
- 2008377907 relation "Also available via the internet.".
- 2008377907 spatial "Iowa Highway 60.".
- 2008377907 subject "625.8/4 22".
- 2008377907 subject "Bridge approaches.".
- 2008377907 subject "Precast concrete. trt".
- 2008377907 subject "Prestressed concrete pavements. trt".
- 2008377907 subject "Slabs. trt".
- 2008377907 subject "TE216 .M47 2007".
- 2008377907 title "Construction of the Iowa Highway 60 precast prestressed concrete pavement bridge approach slab demonstration project / by David K. Merritt ... [et al.] ; Transtec Group, Inc.".
- 2008377907 type "text".